[IGSSTATION-9157] PIE1 - work around monument during the next two weeks
Stowers, David A (US 3621)
david.a.stowers at jpl.nasa.gov
Mon Mar 16 15:15:54 UTC 2026
Please be advised:
A NOAA team will be conducting a local tie survey at Pie Town VLBA from March 16th to March 30th.
Specific dates/times will be noted in the IGS site log as GNSS measurements may be affected.
Best regards,
-dave
[JPL logo]
David Stowers
Network Manager, Global Observing System-GNSS
3x | Flight Communications and Tracking Section 362
JPL
4800 Oak Grove Drive
Pasadena, CA 91109
M: 626.497.8481
O: 818.354.7055
F: 818.393.4965
dstowers at jpl.nasa.gov<mailto:dstowers at jpl.nasa.gov>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.igs.org/pipermail/igsstation/attachments/20260316/35bae1d6/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001[39].png
Type: image/png
Size: 2082 bytes
Desc: image001[39].png
URL: <http://lists.igs.org/pipermail/igsstation/attachments/20260316/35bae1d6/attachment.png>
More information about the IGSSTATION
mailing list