[IGSREPORT-176] ESA/ESOC Analysis Report (week 0686)
J.
J.
Thu Mar 18 17:06:48 PST 1993
***********************************************************************
IGS Electronic Report 18-MAR-1993 17:06:48 Message Number 176
***********************************************************************
From: J. Feltens
Subj: ESA/ESOC Analysis Report (week 0686)
--------------------------------------------
-------------------------
ANALYSIS CENTRE: ESA/ESOC
-------------------------
OUTLINE OF THE ESTIMATION OF GPS-ORBITS AND EARTH ROTATION PARAMETERS
AT THE ESOC PROCESSING CENTRE FOR IGS
J.M.Dow, J.Feltens, T.Martin-Mur, C.Garcia-Martinez
Description of analysis for period 1993 February 28 - March 06
(week 0686)
1. SOFTWARE USED: GPSOBS/BAHN-Version 5
2. MODELS USED AND PARAMETERS ESTIMATED/FIXED:
For a description of models and parameters used ==> see IGS - Mail 51
For updates of the models and parameters used ==> see IGS - Mail 114
3. REMARKS: On day 064 (05 March) we tried to estimate a manoeuvre for
spacecraft SV-14/PRN14. According to our results the mano-
euvre happened around 16:45 UTC. Contrary to experiences
of former manoeuvers, in this case we were not able to
estimate amount and direction of the velocity increment
exactly, and on the following day 065 SV-14 seems to be
worse too. The manouvre for SV-14 was announced in CAN-
space mail of 17 February 1993.
On day 065 (and obviously also on the following days
of week 0687) ground station DRAO has problems with the
receiver clock (IGS Mail 217). So we excluded DRAO from
our processing of day 065.
4. GROUND STATIONS, IGS Mail No. 90, Boucher and Altamimi (if being
estimated, one position (X,Y,Z) per day):
_____________________________________________________________________________
GPSweek|ALBH FAIR HART KOKB MADR MCMU ONSA SANT TIDB WETT |f |e |t
0686___| ALGO GOLD HOBA KOSG MASP METS PAMA STJO TROM YAR1 |i |s |o
|DAY| DRAO GRAZ JPLM KOUR MATE NYAL RCM2 TAIW USUD YELL|x.|t.|t.
---|---|------------------------------------------------------------|--|--|--
|059| eFe FFe e-e eee Fe- ee- F-- ee- eee F-F | 7|16|23
|060| eFe FFe e-e eee Fe- ee- F-- ee- eee F-F | 7|16|23
|061| eFe -Fe e-e eee FeF -e- F-- ee- eee FeF | 7|16|23
|062| eFe -Fe -ee eee FeF -e- F-- ee- eee FeF | 7|16|23
|063| eFe -Fe -ee eee FeF -e- F-- ee- ee- F-F | 7|14|21
|064| eFe -Fe e-e eee FeF -e- F-- ee- eee FeF | 7|16|23
|065| eF- -Fe e-e eee FeF ee- F-- ee- eee FeF | 7|16|23
with: "F" ... coordinates of ground station kept fixed,
"e" ... coordinates of ground station estimated,
"-" ... ground station not included on that day.
5. ORBIT FIT MINUS EXTRAPOLATION FROM PREVIOUS DAY, RMS IN <METER>
\DAY| 059 060 061 062 063 064 065
\ |
\ |
SAT\|
----|-------------------------------------------
02 | 2.2 3.4 1.5 3.1 3.2 2.8 10.6
03 | 2.1 7.8 7.6 9.0 11.8 2.2 2.2
11 | 2.8 1.5 2.5 2.3 6.1 4.3 10.7
12 | 10.3 4.3 8.2 4.9 8.6 2.9 4.9
13 | 29.0 2.6 4.9 15.5 15.4 21.4 47.5
14 | 4.2 2.4 4.5 1.6 2.1 50.3 *****
15 | 2.0 0.9 2.8 2.8 2.5 3.5 27.3
16 | 4.0 11.2 1.9 2.1 1.4 1.9 2.3
17 | 3.0 3.9 6.2 3.6 10.3 2.7 4.7
18 | 14.3 16.3 7.3 5.8 5.2 1.4 2.2
19 | 6.6 4.2 2.7 8.9 1.9 3.1 5.8
20 | 4.8 2.7 1.8 5.6 4.2 5.3 8.2
21 | 3.7 3.3 2.0 4.2 4.0 2.2 5.4
22 | 0.0 5.7 13.1 11.9 30.4 81.1 8.8
23 | 8.8 7.8 7.7 4.8 5.2 3.2 4.5
24 | 5.7 10.8 6.4 2.2 4.5 1.1 12.5
25 | 8.4 5.3 3.4 2.6 7.0 4.3 14.1
26 | 14.4 11.2 5.4 9.1 1.9 6.1 10.9
27 | 4.3 3.5 0.9 1.5 4.1 5.5 16.3
28 | 2.1 6.4 3.8 5.1 4.5 4.7 9.9
29 | 17.3 4.2 5.2 5.8 11.2 11.8 12.8
01 | 1.5 4.0 5.9 2.8 7.6 5.6 5.2
6. PRODUCTS GENERATED:
The following products are generated and stored in CDDIS at NASA/GSFC:
ESA0686*.EPH - Precise GPS orbits, *=0 for Sunday,..., 6 for Saturday
ESA06867.ERP - Earth rotation results for week 0686 (including DUT1R)
ESA06867.SUM - This summary file
End of Message
More information about the IGSREPORT
mailing list