Dear Colleagues,

A power outage and communications failure at ALGO at ~21:40ut on Tuesday March 17, 2015 caused the NRMaser to enter a power save mode with the 5MHz output being interrupted.  Backup power and communications was restored on Thursday May 19, 2015 at ~03:50ut however the maser has not locked correctly.

The TPS-NETG3A at ALGO has been operating on an unlocked maser output since Thursday May 19, 2015 at ~03:50ut.  The receiver has been switched to its steered internal clock until the maser stabilizes.

An updated Site Log will be submitted to the IGSCB shortly.

We apologize for any inconvenience.

Kind Regards,
Stuart Elson

Geodetic Engineer - Canadian Geodetic Survey
Natural Resources Canada / Government of Canada
Stuart.Elson at NRCan-RNCan.gc.ca<mailto:Stuart.Elson at NRCan-RNCan.gc.ca> / Tel: (613) 601-8989
588 Booth St., Rm. 355A
Ottawa, ON, K1A 0Y7

Ingénieur en géodésie - Levés géodésiques du Canada
Ressources naturelles Canada / Gouvernement du Canada
Stuart.Elson at NRCan-RNCan.gc.ca<mailto:Stuart.Elson at NRCan-RNCan.gc.ca> / Tél: (613) 601-8989
588 rue Booth, Pièce: 355A
Ottawa, Ontario, K1A 0Y7








-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.igs.org/pipermail/igsstation/attachments/20150320/e2a6d96b/attachment.html>


More information about the IGSSTATION mailing list