[IGSSTATION-3741]: KOKB Hydrogen Maser change
Khachikyan, Razmik (3350-Affiliate)
razmik.khachikyan at jpl.nasa.gov
Thu May 13 09:11:11 PDT 2010
******************************************************************************
IGS Station Mail 13 May 09:12:09 PDT 2010 Message Number 3741
******************************************************************************
Author: Razmik Khachikyan
We have been informed that the a frequency change to the Kokee Park Sigma Tau maser was performed by local personnel on 2010.132(May 12) at 17:11UTC. A -1.156e-13 frequency
offset was removed. The change was made using the synthesizer and was immediate.
An updated sitelog has been forwarded to IGSCB.
Maintenance and operations of the KOKB station is a collaborative effort
supported by JPL, UNAVCO, and the Kokee Park Geophysical Observatory with
funding provided by NASA's Earth Surface and Interior Focus Area - Science
Mission Directorate.
Best regards,
-Razmik
More information about the IGSSTATION
mailing list