[IGSSTATION-116]: MADR: clock steering
Razmik Khachikyan
razmik at jpl.nasa.gov
Wed Aug 11 17:33:26 PDT 2004
******************************************************************************
IGS Station Mail 11 Aug 17:33:28 PDT 2004 Message Number 116
******************************************************************************
Author: Razmik Khachikyan
Dear Colleagues,
After the ASHTECH Z-XII3 receiver was configured to run off of the external
reference (IGSSTATION-108) at site MADR (Madrid, Spain), a performance drop
was noticed. Due to this poor performance, we have switched back to internal
VCO steering on 2004.219 around 16:30UTC. Steps are being taken to replace
the receiver.
An updates sitelog has been submitted to IGSCB.
Best regards,
...Razmik
More information about the IGSSTATION
mailing list