JPL ANALYSIS REPORT GPS-WEEK 0875 (DAYS 287-293, DATES 1996 Oct 13 - Oct 19)
******************************************************************************
Submitted by the JPL IGS/FLINN Analysis Team:
J F Zumberge, D C Jefferson, M B Heflin, M M Watkins, F H Webb
all at the Jet Propulsion Laboratory, California Institute of Technology,
Pasadena, CA 91109.
Files listed below are available in Unix compressed format and can be
retrieved using anonymous ftp to sideshow.jpl.nasa.gov (128.149.70.41),
directory pub/jpligsac/0875. These files have also been sent to the CDDIS.
______________________________________________________________________________
filename contents
______________________________________________________________________________
jpl08757.sum This text file.
jpl08757.erp Earth rotation parameters for GPS week 875.
jpl08757.snx Ground station coordinates for GPS week 875, SINEX format.
jpl0875[0-6].sp3 GPS ephemerides for GPS week 875, sp3 format.
______________________________________________________________________________
Median Orbit Repeatability (see table below): 13.0 cm
(excluding deweighted satellites)
According to the file nanu1996.mes obtained from the IGS CBIS, PRN31 was
unusable on days 289 and 290 for maintenance/repositioning. Data from
this satellite did not meet our convergence criteria on either day, and
have been excluded from the analyses of both.
Due to potential problems, data from stations mentioned below were not
considered for use in the global solution for the day indicated. (For
geographical reasons, they may not have been used in any case.)
WARNING: PIE1 (not ALGO) used as reference clock day 290.
WARNING: FAIR (not ALGO) used as reference clock day 291.
WARNING: Data from PRN10, PRN30 deweighted for the entire GPS week 875.
WARNING: Data from PRN31 excluded days 289 and 290 due to a maneuver.
WARNING: Data from DGAR, SNI1 excluded day 287.
WARNING: Data from DGAR, MEDI excluded day 288.
WARNING: Data from DGAR, ONSA excluded day 289.
WARNING: Data from DGAR, MADR, ONSA excluded day 290.
WARNING: Data from BOGT, DGAR, MDVO excluded day 291.
WARNING: Data from DGAR, UPAD excluded day 292.
WARNING: Data from LPGS, ZWEN excluded day 293.
In the following table, UT1R-UTC are the integrated values based on estimated
LODR values in the adjacent column. See IGS Report No. 1498 (jpl07827.sum)
for details:
JPL ERP TABLE GPS week 875 (1996 Oct 13 - Oct 19)
MJD XPole Ypole UT1R-UTC LODR Xsig Ysig UTsig LODsig Nr Nf Nt Xrt Yrt
10**-5" usec us/d 10**-5" us us/d 10**-5"/d
50369.50 24156 18724 39922 2097 4 4 10 10 37 10 26 -230 -329
50370.50 23894 18424 37801 2145 3 4 10 10 37 10 26 -262 -307
50371.50 23628 18139 35686 2086 4 4 10 10 37 11 25 -253 -297
50372.50 23418 17868 33575 2135 3 4 10 10 37 10 25 -230 -313
50373.50 23189 17620 31446 2124 3 4 10 10 37 11 26 -238 -312
50374.50 22942 17324 29339 2089 3 4 10 10 37 11 26 -246 -315
50375.50 22669 17073 27238 2114 3 4 10 10 37 11 26 -218 -289
END ERP TABLE
The following table indicates the "3-dimensional orbit repeatability", as
defined in IGS Mail Message 37, for GPS week 875:
["3d rss" = sqrt(xrms**2 + yrms**2 + zrms**2)]
JPL ORBIT REPEATABILITY TABLE GPS week 875 (1996 Oct 13 - Oct 19)
96 10 13 96 10 14 96 10 15 96 10 16 96 10 17 96 10 18 96 10 19
prn 3d rss (m)
1 0.10 0.18 0.18 0.16 0.16 0.21 0.21
2 0.15 0.09 0.07 0.10 0.14 0.09 0.09
3 0.25 0.28 0.23 0.21 0.19 0.27 0.24
4 0.10 0.21 0.14 0.19 0.10 0.16 0.11
5 0.11 0.14 0.11 0.15 0.14 0.12 0.18
6 0.12 0.10 0.15 0.16 0.12 0.10 0.12
7 0.07 0.11 0.13 0.10 0.11 0.09 0.12
9 0.10 0.10 0.17 0.17 0.08 0.26 0.21
10 1.67 1.39 2.05 2.41 1.56 1.89 1.81
14 0.10 0.23 0.14 0.19 0.09 0.12 0.13
15 0.07 0.10 0.10 0.10 0.10 0.13 0.16
16 0.10 0.14 0.07 0.09 0.12 0.14 0.16
17 0.26 0.27 0.17 0.19 0.12 0.18 0.25
18 0.27 0.14 0.10 0.05 0.08 0.12 0.11
19 0.18 0.11 0.14 0.08 0.18 0.26 0.16
21 0.10 0.09 0.13 0.08 0.09 0.14 0.11
22 0.10 0.09 0.14 0.13 0.11 0.11 0.10
23 0.28 0.26 0.21 0.20 0.09 0.16 0.12
24 0.12 0.16 0.16 0.07 0.14 0.07 0.08
25 0.10 0.13 0.17 0.18 0.15 0.18 0.18
26 0.24 0.32 0.33 0.34 0.11 0.11 0.13
27 0.13 0.09 0.09 0.13 0.11 0.17 0.17
28 0.11 0.20 0.17 0.12 0.12 0.15 0.10
29 0.14 0.20 0.16 0.08 0.10 0.10 0.06
30 3.50 3.48 3.18 3.31 2.97 2.95 3.20
31 2.50 4.7 0.1 0.17 0.19
_______________________
END ORBIT REPEATABILITY TABLE
The following table statistically summarizes this week's "engineering data", as
described in IGS Report No. 1528:
JPL ENGINEERING DATA SUMMARY TABLE GPS week 875 (1996 Oct 13 - Oct 19)
receiver/transmitter (dot means point positioned, * means fiducial site)
| days analyzed
| | rms clock noise (ns)
| | | average clock solution (us)
| | | | rms pseudorange (cm)
| | | | | (dot means pcode not analyzed)
| | | | | rms phase (mm)
| | | | | | average arc (hr)
| | | | | | |
|___ |__ |_______ |_______ |___ |___ |__
ALBH 1.0 12.0 2.14 35.0 4.00 2.87
ALGO* 6.3 130. .408 50.0 4.89 2.45
ANKR 1.0 99.3 -.362 55.0 4.00 3.04
AREQ 2.9 98.9 -.427 42.3 4.81 1.73
ASC1 4.7 703. -.108 66.2 5.13 1.39
BAHR 5.6 .476 266. 49.5 5.12 2.78
BOGT 2.0 99.7 -.344e-01 62.4 7.00 .841
BRAZ 3.0 268. -.223 63.0 5.00 1.39
BRMU 1.9 103. -.321 38.5 5.49 2.14
BRU1 1.0 .289e+06 482. 86.0 7.00 2.47
BRUS 5.0 .230 5.19 60.5 5.40 2.21
CHAT 7.0 99.4 -.263 79.4 5.00 2.36
CRO1 5.7 530. -.300 41.4 7.53 1.93
DGAR .5 .213e+06 -33.7 . 4.00 .638
EISL 3.4 .558e+07 -.133e+05 41.6 5.83 2.31
ENG1 2.7 .289e+06 512. 97.2 11.7 2.42
FAIR* 7.0 .224 -.682 35.7 4.74 1.82
FLIN 6.0 78.2 -.298 52.9 4.49 2.13
FORT 5.9 .151 -.247 48.2 6.55 2.53
GODE 1.0 .951e-01 -.106 45.0 4.00 2.60
GOL2* 7.0 78.3 -.161 48.0 4.71 2.40
GUAM 7.0 104. -.272 54.5 7.63 2.22
HART* 7.0 451. 2.90 46.0 5.04 2.26
HKLO 1.9 .289e+06 491. 49.0 5.33 1.93
IRKT 4.5 .266 -.106 52.6 4.44 2.54
KELY 2.9 82.4 -.412 67.1 6.00 1.09
KERG 7.0 134. -16.9 . 4.86 2.13
KIRU 4.0 2.56 -.118e-01 52.0 6.76 1.71
KIT3 7.0 125. -.266 57.7 4.00 2.65
KOKB* 7.0 110. .881 79.0 7.39 2.29
KOSG* 6.9 3.36 1.25 44.2 3.85 2.03
KOUR 1.0 2.56 9.73 . 7.00 1.75
KWJ1 7.0 86.3 -.262 57.4 7.78 1.61
LHAS 6.7 .931e+04 .540 68.4 5.00 2.10
MADR* 3.5 21.7 .137 . 5.00 1.99
MALI 3.8 63.0 -49.0 . 8.46 1.74
MAS1 3.9 218. -7.63 48.3 4.53 2.49
MCM4 7.0 93.0 -.255 46.4 5.26 1.43
MDVO .9 .161 351. 66.0 6.00 2.30
MKEA 4.0 .789e-01 -.485 47.8 5.62 2.08
MOIN 1.9 91.3 .452e-01 59.6 6.13 1.67
NOTO 2.9 .135 -2.87 37.0 5.00 2.71
OHIG 5.0 .325e+05 -2.40 49.6 4.00 1.26
PAMA 6.9 411. -.264 . 8.93 1.66
PERT 7.0 2.06 -1.63 48.9 4.24 2.42
PIE1 .9 . . 38.0 5.00 2.44
REYK 4.8 80.6 -.242 57.6 6.39 1.82
SANT* 6.9 323. -.192 45.6 4.49 1.91
STJO 5.0 38.1 -.298 40.2 4.23 1.88
THU1 4.8 70.9 -.249 46.2 5.00 2.28
TID2* 7.0 2.10 -.470 41.0 5.60 2.57
USUD 7.0 2.50 -.256 34.6 4.32 2.48
VILL .9 1.91 -1.19 40.0 4.00 2.73
WTZR* 7.0 34.5 -.867e-01 60.7 4.31 2.51
WUHN 3.0 4.51 -217. 45.3 5.00 2.08
YELL* 7.0 .703 -1.98 58.3 4.73 1.33
PRN01 7.0 80.3 4.60 53.0 5.62 2.16
PRN02 7.0 81.0 -300. 55.2 5.40 2.34
PRN03 6.9 78.5 61.6 55.3 5.79 2.04
PRN04 7.0 81.2 49.3 52.8 6.00 2.00
PRN05 7.0 82.1 62.8 51.1 5.78 2.25
PRN06 7.0 82.1 2.49 52.0 5.72 2.39
PRN07 7.0 83.1 729. 57.2 5.57 2.04
PRN09 6.8 80.0 -14.2 57.1 5.41 2.06
PRN14 7.0 81.8 15.2 50.9 5.86 2.21
PRN15 7.0 3.18 351. 58.5 5.74 2.14
PRN16 7.0 80.8 29.2 52.8 5.00 2.23
PRN17 7.0 79.5 -129. 54.3 5.41 2.03
PRN18 7.0 82.8 13.7 49.7 5.85 2.16
PRN19 6.8 82.8 148. 53.4 5.78 2.18
PRN21 6.9 82.8 1.68 53.5 5.48 2.10
PRN22 7.0 78.9 344. 51.2 5.72 2.23
PRN23 7.0 79.7 4.74 57.0 5.58 2.01
PRN24 7.0 80.8 332. 54.6 5.96 2.09
PRN25 6.7 82.2 -3.83 51.7 6.19 2.09
PRN26 7.0 82.0 -53.7 53.7 5.65 2.29
PRN27 6.8 82.5 4.80 52.5 5.38 2.25
PRN28 6.9 2.22 112. 64.8 4.78 2.26
PRN29 7.0 82.3 1.58 45.4 5.40 2.44
PRN31 4.3 82.1 14.7 53.8 5.70 1.82
_______________________
END ENGINEERING DATA SUMMARY TABLE
As described in IGS Mail Message 37, the following table compares the JPL
precise ephemerides with those from the broadcast ephemeris:
JPL COMPARISON OF BROADCAST NAVIGATION MESSAGE WITH PRECISE EPHEMERIDES
96 10 13 96 10 14 96 10 15 96 10 16 96 10 17 96 10 18 96 10 19
prn 3d rss (m)
1 6.1 5.2 6.2 5.0 5.5 5.7 7.6
2 2.2 2.7 2.5 3.5 5.2 3.8 2.8
3 4.5 4.1 4.7 4.6 4.2 7.2 4.7
4 4.9 4.7 4.3 4.5 4.8 4.6 5.0
5 3.2 2.9 3.1 3.3 3.5 3.9 3.4
6 6.7 6.4 5.7 5.8 6.0 6.5 6.0
7 3.0 3.4 4.3 3.8 3.9 4.0 4.2
9 4.0 4.0 3.9 4.1 4.5 4.3 6.0
10 10.1 9.2 9.0 9.8 11.7 10.2 7.8
14 3.3 4.7 4.8 2.7 5.0 3.6 3.1
15 3.0 3.5 3.6 3.3 3.1 3.8 4.4
16 2.8 3.3 3.2 3.2 2.8 3.4 2.6
17 3.0 3.0 2.8 2.5 3.2 3.3 2.9
18 4.4 5.7 4.3 2.0 2.8 3.4 4.9
19 3.3 3.0 7.0 9.6 5.8 4.7 4.1
21 3.9 3.5 2.7 3.3 3.7 2.6 2.9
22 5.5 5.4 4.1 5.5 5.5 5.5 4.5
23 3.6 2.4 2.6 2.8 2.8 2.2 2.5
24 4.7 4.9 4.7 4.5 4.3 4.6 4.6
25 5.6 6.2 9.0 8.4 11.0 10.9 9.3
26 2.7 3.3 3.5 3.3 3.3 3.2 3.3
27 8.3 6.6 8.1 8.3 8.6 8.4 7.8
28 6.9 5.5 3.8 3.9 3.5 3.4 5.5
29 3.8 3.2 3.3 2.8 4.0 3.6 3.5
30 8.1 9.6 7.4 7.3 7.8 7.2 8.5
31 2.1 4.0 5.2 2.3 1.7
_______________________
END COMPARISON OF BROADCAST NAVIGATION MESSAGE WITH PRECISE EPHEMERIDES