[IGSREPORT-1066] Wk 0754 GFZ Analysis Report

G.Gendt G.Gendt
Fri Jul 1 05:53:40 PDT 1994


******************************************************************************
IGS Electronic Report    Fri Jul  1  5:53:40 PDT 1994      Message Number 1066
******************************************************************************

Author: G.Gendt, G. Dick
Subject: Wk 0754 GFZ Analysis Report

Subject: Wk 0754 GFZ Analysis Report 


******************************************************************************
GFZ ANALYSIS REPORT   GPS-WEEK 0754 (DAYS 170-176, DATES 19-06-94 TO 25-06-94)
******************************************************************************

Submitted by: G. Gendt, Ch. Reigber, G. Dick, Th. Nischan, W. Mai 
              GeoForschungsZentrum Potsdam (GFZ)
             
              Telegrafenberg A17, D-14473 Potsdam, Germany
              e-mail:gend at gfz-potsdam.de
              fax: (0331) 288 1111
              tel: (0331) 288 1114 

PRODUCT SUMMARY

FILES SENT TO IGN: 
______________________________________________________________________________
gfz07547.sum           this text file
gfz07547.erp           Earth rotation parameters 
gfz0754[0-6].sp3       Daily orbit ephemerides , SP3 format
______________________________________________________________________________


ERP RESULT

GFZ    ERP-RESULTS for WEEK 754       DAYS   170 - 176
______________________________________________________________________________
  MJD      Xpole  Ypole  UT1R-TAI  LODR Xsig Ysig UTsig LODsig Nr Nf Nt
          10**-5" 10**-5"  usec    us/d    10**-5"   us  us/d
49522.500  15599  23421 -28196626  1654    3    3    0    4    31 20 25
49523.500  15437  23189 -28198165  1533    3    3    0    4    31 20 25
49524.500  15262  22959 -28199695  1392    3    3    0    4    30 20 25
49525.500  15116  22725 -28200852  1306    3    3    0    3    30 20 25
49526.500  14984  22514 -28202020  1242    3    3    0    3    30 20 25
49527.500  14852  22344 -28203167  1136    3    3    0    4    30 20 25
49528.500  14694  22146 -28204388  1179    3    3    0    4    29 19 25
------------------------------------------------------------------------------




ORBITS REPEATABILITY (cm):
(mean component error rms =sqrt((xrms**2 + yrms**2 + zrms**2)/3) )


            DAY 1  (32 h)              DAY 2  (32 h)
   |------------------------|--------|                            
 
                            |------------------------|--------|

   Six-hour overlap:        |xxxxxx|


   (only rms < 120 are used for MEAN)

Note: E - indicates that the satellite is in eclipse

---------------------------------------------------
                 RMS for DAY
PRN  170    171    172    173    174    175    176
-------------------------------------------------------
 1    32     18     23     22     19     14     17  
 2    32     22     28     24     30     24     28  
 4    54     62     78     66 E   48 E   37 E   47 E
 5    27     32     27     28     24     52     54  
 6    22     28     20     25     24     28     87  
 7    29     37     30     54     29     27     26  
 9    23     28     24     20     18     18     31  
12   104     33     33     24 E   16 E   17 E   48 E
14    22     18     17     28     22     28     24  
15    97     40     35     37 E   55 E   71 E   71 E
16    12     20     15     17     21     19     12  
17    22     30     33     28 E   31 E   31 E   47 E
18    44     18     23     16     21     22     19  
19    28     30     24     22     25     22     20  
20    47     24     35     21     29     40     28  
21    31     27     25     20     25     22     21  
22    34     35     25     26     25     25     35  
23     8     10      6      6      6      9     19  
24    64     88     61     54 E   67 E   44 E   75 E
25    40     21     22     24     20     23     27  
26    21     13     13     18     14     14     15  
27    24     20     20     15     21     16     20  
28    19     22     17     18     20     22     26  
29    33     18     23     27     17     21     18  
31    12     33     19     18     25     20     23  
 
MEAN  42     33     31     29     29     30     39
---------------------------------------------------

REMARKS: 

                
CLOCK ESTIMATION:  ALGO was used as time reference



STATIONS USED BY GFZ INCLUDING STATISTICS

Sampling rate: 6 minutes         
                                                          
 IGS  INTERNAL         OBSERVATIONS for DAY
 CODE  STA#               170  171  172  173  174  175  176
----------------------------------------------------
onsa  105001   I'92      1627 1599 1570 1090 1199 1578 1598
kosg  110001 F I'92      1649 1639 1614 1637 1653 1646 1654
madr  120001 F I'92      1405 1641  859 1284 1642 1650 1586
mate  130001 F           1717 1693 1598 1341 1523 1667 1716
trom  150001 F I'92      1288 1291 1268 1446 1658 1730 1731
wetb  160001 F I'92      1665 1250  403 1658 1661 1644 1699
mets  180001   I'92      1623 1598 1555 1570 1549 1587 1579
usud  200002             1577 1550 1621 1580 1564 1609 1522
taiw  220001 F I'92      1647 1673 1641 1655 1682 1696 1713
tidb  305001 F           1473 1605 1637 1643 1644 1654 1589
yar1  310001 F I'92       425 1525 1720 1720 1705 1696 1734
hob1  320001             1488 1544 1554 1591 1622 1606 1586
algo  400003 F I'92      1560 1656 1665 1677 1630 1681 1616
stjo  405002 F           1751 1701 1704 1691 1675 1705 1713
wes2  408001             1684 1654 1621 1630 1455 1662 1704
gold  410001 F I'92       908 1358 1410  825 1180 1418 1392
jplm  415001 F           1685 1670 1659 1671 1649 1646 1655
fair  420001 F I'92      1461 1705 1704 1712 1686 1702 1159
yell  470002 F I'92      1653 1626 1469 1628 1564 1619 1619
drao  475002 F           1724 1684 1709 1705 1675 1685 1621
rcm5  482001   I'92      1701 1670 1661 1657 1677 1684 1679
sant  500001 F I'92      1211 1519 1265  498 1259  891  789
kour  510001 F           1558 1535 1534 1564 1498 1534 1540
fort  520001             1590 1551 1581 1578 1520 1470 1567
areq  530002             1720 1722 1750 1723 1758 1755 1714
hart  600001 F I'92      1349  905 1438 1399 1387 1328 1354
masp  610001 F I'92      1670 1699 1741 1735 1715 1748 1729
mas1  610101             1683 1679 1720 1712 1704 1715 1733
kokb  700001 F I'92      1355 1625 1744 1718 1549  259    0
mcmu  800002             1556 1642 1717 1694 1705 1628 1639

Note: F    - indicates a constrained fiducial site ( to 1-2 mm )
      I'92 - indicates that initial station coordinates are from ITRF'92



SATELLITES STATISTICS

                OBSERVATIONS for DAY
PRN     170  171  172  173  174  175  176
------------------------------------------
  1    2044 2046 2046 2107 2141 2043 1985
  2    1872 1926 1880 1793 1875 1888 1928
  4    1669 1781 1679 1661 1758 1679 1758
  5    1973 2073 1889 1852 2088 2049 2078
  6    2022 2158 2053 2025 2063 1979 1941
  7    1670 1721 1717 1691 1659 1785 1768
  9    2156 2174 2018 2095 2270 2190 2172
 12    2051 2206 2036 2076 2204 2067 2057
 14    1605 1792 1777 1910 1940 1836 1798
 15    1567 1709 1667 1782 1784 1686 1688
 16    2043 2063 1994 1806 1753 1988 2056
 17    1954 2136 2085 2022 2051 1929 1946
 18    1921 1898 1848 1813 1824 1838 1804
 19    1996 1943 1873 1825 1847 1956 1884
 20    1800 1943 1727 1805 1988 1890 1925
 21    1949 2020 1921 1993 2026 1943 1847
 22    1911 1825 1875 1907 1876 1885 1792
 23    2160 2195 2094 2167 2195 2133 2065
 24    1768 1895 1767 1734 1907 1868 1717
 25    1890 1946 1890 1921 1970 1891 1941
 26    2345 2452 2331 2259 2298 2280 2118
 27    1988 2026 1989 1964 2045 2047 2006
 28    1842 1874 1805 1761 1732 1755 1671
 29    1809 1847 1803 1840 1821 1816 1795
 31    1885 1877 1882 1855 1814 1871 1802
-----------------------------------------



SOLUTION CHARACTERISTICS

1. Software used :   EPOS.P.V2
2. Definition of Terrestrial Reference Frame
     Fiducial-free adjustment of all station coordinates.
     These  coordinates are then fixed in the determination of ERPs and ORBITS
 
3. Data used:
   - undifferenced carrier phases
   - 32 h arc solutions   

5. Adjusted parameters:
   - state vector of all satellites
   - coordinate corrections 
   - daily ERPs
   - tropospheric zenith path delay (4 h)
   - y-bias, solar radiation scaling factor
   - ambiguities
   - STA and SV clock parameters of each observation epoch
    



More information about the IGSREPORT mailing list