ANALYSIS CENTRE: ESA/ESOC
-------------------------
OUTLINE OF THE ESTIMATION OF GPS-ORBITS AND EARTH ROTATION PARAMETERS
AT THE ESOC PROCESSING CENTRE FOR IGS
J.M.Dow, J.Feltens, T.J.Martin-Mur, C.Garcia-Martinez
Description of analysis for period 1993 Oct 03 - Oct 09
(week 0717)
1. SOFTWARE USED: GPSOBS/BAHN-Version 5
2. MODELS USED AND PARAMETERS ESTIMATED/FIXED:
For a description of models and parameters used ==> see IGS - Mail 51
For updates of the models and parameters used ==> see IGS - Mail 114 and
see IGS - Rep. 224,277
3. REMARKS: - Satellite SV09/PRN13 has been excluded on day
276. On day 280, the orbit is affected by the
lack of double differences during the first
half of the day. This satellite was declared
unusable from 12:00 DOY 273 for up to 10 days
due to maintenance. See CANSPACE mail of 17 Sep 93.
- On days 277 and 278, high residuals for satellite
SV-32/PRN01. Bad comparisons with extrapolated orbits
on days 277, 278 and 279. The satellite was excluded
from the the estimation of the ERPs on day 278.
4. GROUND STATIONS: Boucher and Altamimi, IGS workshop Berne 24-27 March'93
IGS/IERS station coordinates in the ITRF91 at 1992.6
___________________________________________________________
GPSweek|ALGO HART KOUR MATE SANT USUD YELL |f |e |t
0717___| FAIR KIRU MADR MCMU TIDB WETT |i |s |o
|DAY| GOLD KOKB MASP PERT TROM YAR1 |x.|t.|t.
---|---|------------------------------------------|--|--|--
|276| FFF FeF eFe eee FFF eFF F |12| 7|19
|277| FFF FeF eFe eee FFF eFF F |12| 7|19
|278| FFF FeF eFe eee FFF eFF F |12| 7|19
|279| FFF FeF eFe eee FFF eFF F |12| 7|19
|280| FFF FeF eFe e-e FFF eFF F |12| 6|18
|281| FFF FeF eFe e-e FFF eFF F |12| 6|18
|282| FFF FeF eFe eee FFF eFF F |12| 7|19
with: "F" ... coordinates of ground station kept fixed,
"e" ... coordinates of ground station estimated,
"-" ... ground station not included on that day.
5. ORBIT FIT MINUS EXTRAPOLATION FROM PREVIOUS DAY, RMS IN <CENTIMETER>
\DAY| 276 277 278 279 280 281 282
\ |
\ |
SAT\|
----|-------------------------------------------
02 | 130 105 55 83 67 60 45
03 | 112 43 22 108 60 29 36
12 | 33 43 33 50 62 29 35
13 | -- -- 57 31 147 67 117
14 | 48 57 64 151 23 36 35
15 | 38 53 258 45 47 51 28
16 | 56 168 99 46 52 47 162
17 | 37 48 45 126 41 29 42
18 | 92 79 62 82 76 65 79
19 | 40 107 44 86 73 78 142
20 | 80 49 34 75 51 63 60
21 | 86 142 69 170 105 54 58
22 | 45 75 38 50 44 49 56
23 | 78 45 73 114 95 31 46
24 | 190 101 22 40 32 69 151
25 | 77 53 73 46 44 33 147
26 | 74 62 72 72 71 58 85
27 | 87 94 52 63 56 87 103
28 | 40 117 90 47 121 107 43
01 | 115 171 466 205 65 120 90
29 | 101 116 93 98 84 97 97
31 | 53 105 67 65 73 67 133
07 | 176 58 58 112 41 114 65
09 | 40 59 47 62 68 34 56
05 | 119 68 137 83 57 55 86
6. PRODUCTS GENERATED:
The following products are generated and stored in CDDIS at NASA/GSFC:
ESA0717*.EPH - Precise GPS orbits, *=0 for Sunday,..., 6 for Saturday
ESA07177.ERP - Earth rotation results for week 0717 (including DUT1)
ESA07177.SUM - This summary file
End of Message
More information about the IGSREPORT
mailing list