[IGSREPORT-601] EMR Analysis Report (week 722)
Jan
Jan
Thu Nov 18 11:10:22 PST 1993
***********************************************************************
IGS Electronic Report 18-NOV-1993 11:10:22 Message Number 601
***********************************************************************
From: Jan Kouba
Subj: EMR Analysis Report (week 722)
-------------------------------------
(Nov 07 - Nov 13,93)
Our analysis utilizes the JPL GIPSY/OASIS II (UNIX) software system
and data from all (up to 7) Canadian stations augmented by up to 12, globally
distributed, core stations (see Table 1 for the list of stations).
This effort is a part of a joint pilot project called
"Active Control System" and involves the Geodetic Survey Division (GSD),
SMRSS; the Geophysics Division and Pacific Geoscience Centre of the
Geological Survey of Canada, all three institutions are part of the
Department of Energy, Mines & Resources (EMR).
Table 1 : Station Summary (also indicated are day no. for which a
particular station is not included in the daily solution, either due to
being down or data being late).
STATION IGS code MISSING DAY NO. 1993
Albert Head, CAN ALBH
Algonquin, CAN ALGO*
Fairbanks FAIR* 311
Goldstone GOLD*
Hartebeesthoek HART*
Holberg,CAN HOLB
Kokee Park KOKB
Madrid MADR*
McMurdo MCMU* 311, 315 to 317
Pamatai PAMA 312 to 317
Penticton, CAN DRAO
Santiago SANT*
St. Johns, CAN STJO
Canbera TIDB*
Tromsoe TROM*
Wettzell WETT* 311 to 317
Yarragadee YAR1* 313
Yellowknife, CAN YELL*
* indicates constrained stations, remaining are solved for (50m apriori sig.)
SOLUTION CHARACTERISTICS
Reference frame and orientation:
Nominally ITRF91, at epoch 1992.5 is realized by constraining up to 12
of the above stations at the IGS coordinates (see IGS message #90).
Orientation is realized through the above coordinates and, once a week,
the fixed DUT1 values from the current NEOS/IERS (Bull. A).
Constants and models:
- no change, see the IGS mess. #101 for details.
Estimation strategies:
- no change, see the IGS mess. #101 for details - , except for the estimation
of DUT1, stochastic orbit modeling, new weighting of L3,P3,
see IGS mess. #130.
ALGO was used as time reference.
Aposteriori variance factors typically are between 0.5 and 1.0 (noise
about 3mm and 200mm for phase and smoothed pseudorange observations, resp.).
PRODUCTS GENERATED:
The following products are generated and uploaded into CDDIS @ NASA/GSFC
EMR07220-6.EPH GPS ephem. files for days 0-6, week #722 in sp3 format
EMR07227.ERP pole x,y and DUT1 solutions for week #722
EMR07227.SUM name of this text summary file
REMARKS on EMR's products:
1. ALGO hydrogen maser used as a time reference. In the sp3 EPH file sat.
epochs with no reference (e.g. ALGO not observing a satellite) have a value
of 99999. microseconds.
ALGO clock error & drift were about -800 ns (49298) & -10 ns/day w.r.t.
GPS time.
2. Starting with the week #720 we are assigning nominal sigma codes of 8(256mm)
for all the orbits passing our quality analysis. For errors larger than 1.5m
we are assigning sigmas of abs(error)/4, expressed by the binary
exponent in the sp3 header.
3. AS was on for Nov.08 & Nov.09 (days 312/313); all obserrvations for the
affected satellites were downweighted, no DUT1 estimation on AS days.
4. WETT was removed from the processing on Nov.07(day311) due to corrupted file.
5. Only 50% or less data for PRN13 for all days during this week. PRN 3 changed
orbit by about 1 km on or before November 9. Only 15% and 40% of usual
data for PRN 3 on Nov. 8 and 9, respectively.
More information about the IGSREPORT
mailing list