[IGSREPORT-319] ESA06987.SUM

C.Garcia C.Garcia
Wed Jun 9 08:49:19 PDT 1993


***********************************************************************
IGS Electronic Report      9-JUN-1993 08:49:19       Message Number 319
***********************************************************************
 

From: C.Garcia
Subj: ESA06987.SUM
------------------


 -------------------------
 ANALYSIS CENTRE: ESA/ESOC
 -------------------------

 OUTLINE OF THE ESTIMATION OF GPS-ORBITS AND EARTH ROTATION PARAMETERS
 AT THE ESOC PROCESSING CENTRE FOR IGS

 J.M.Dow, J.Feltens, T.Martin-Mur, C.Garcia-Martinez

 Description of analysis for period 1993 May 23 - May 29
                                                        (week 0698)
 1. SOFTWARE USED:   GPSOBS/BAHN-Version 5

 2. MODELS USED AND PARAMETERS ESTIMATED/FIXED:

  For a description of models and parameters used ==> see IGS - Mail  51
  For updates of the models and parameters used   ==> see IGS - Mail 114 and
                                                      see IGS - Rep. 224,277
 3. REMARKS: For day 147 (27 May 93) a manoeuvre has been announced for
             SV-22/PRN22 (CANSPACE mail of 20 May 93). We detected the
             manoeuvre at 11:29 UTC on day 147 and estimated a velocity
             increment of 38.1 <mm/sec>.

 4. GROUND STATIONS: Boucher and Altamimi, IGS workshop Berne 24-27 March'93
                     IGS/IERS station coordinates in the ITRF91 at 1992.6
 ___________________________________________________________
 GPSweek|ALGO  HART  MADR  MCMU  SANT  USUD  YELL  |f |e |t
 0698___| FAIR  KOKB  MASP  PAMA  TIDB  WETT       |i |s |o
    |DAY|  GOLD  KOUR  MATE  RCM2  TROM  YAR1      |x.|t.|t.
 ---|---|------------------------------------------|--|--|--
    |143| FFF   FFe   -ee   e-e   FFF   eFF   F    |11| 6|17
    |144| FFF   FFe   Fee   e-e   FFF   eFF   F    |12| 6|18
    |145| FFF   FFe   Fee   e-e   FFF   eFF   F    |12| 6|18
    |146| FFF   FFe   Fee   e-e   FFF   eFF   F    |12| 6|18
    |147| FFF   FFe   Fee   e-e   FFF   eFF   F    |12| 6|18
    |148| FFF   FFe   Fee   e-e   FFF   eFF   F    |12| 6|18
    |149| FFF   FFe   Fee   e-e   FFF   -FF   F    |12| 5|17

    with: "F" ... coordinates of ground station kept fixed,
          "e" ... coordinates of ground station estimated,
          "-" ... ground station not included on that day.

 5. ORBIT FIT MINUS EXTRAPOLATION FROM PREVIOUS DAY, RMS IN <METER>

  \DAY|  143   144   145   146   147   148   149
   \  |
    \ |
  SAT\|
  ----|-------------------------------------------
   01 |  1.7   1.7   0.7   1.0   1.6   3.9   2.3
   02 |  0.5   1.1   1.0   2.0   1.5   1.2   0.8
   03 |  2.2   0.8   1.1   1.3   1.4   1.3   2.2
   12 |  0.8   0.8   0.7   0.9   1.2   1.4   1.0
   13 |  1.4   2.0   1.1   1.4   1.0   1.6   1.5
   14 |  0.5   0.8   1.0   0.8   3.0   5.3   1.1
   15 |  4.0   1.1   0.6   1.1   1.1   1.2   1.5
   16 |  1.0   0.7   1.3   1.1   1.2   1.6   1.1
   17 |  3.2   1.3   1.7   1.4   1.5   1.5   1.4
   18 |  2.2   0.9   2.0   2.1   1.3   2.4   1.6
   19 |  2.3   1.4   1.5   1.6   1.6   1.6   3.7
   20 |  1.8   1.7   1.1   2.2   1.4   2.3   3.5
   21 |  1.0   0.8   0.3   0.8   1.9   2.8   0.8
   22 |  1.8   1.1   2.6   2.1   6.0   5.8   3.0
   23 |  1.0   1.1   1.7   0.8   0.8   2.1   1.4
   24 |  0.8   0.9   2.0   1.8   0.7   0.8   1.8
   25 |  1.4   1.4   1.0   1.5   1.2   2.2   1.8
   26 |  1.7   1.0   0.8   1.4   3.3   3.3   2.0
   27 |  1.8   1.5   2.7   1.2   3.1   1.6   4.4
   28 |  1.6   1.9   1.1   1.1   2.6   6.5   3.9
   29 |  1.4   1.2   2.2   1.9   2.3   2.5   2.2
   31 |  6.1   2.2   1.0   1.2   4.6   2.4   1.3

 6. PRODUCTS GENERATED:

  The following products are generated and stored in CDDIS at NASA/GSFC:

  ESA0698*.EPH - Precise GPS orbits, *=0 for Sunday,..., 6 for Saturday
  ESA06987.ERP - Earth rotation results for week 0698 (including DUT1R)
  ESA06987.SUM - This summary file

 End of Message



More information about the IGSREPORT mailing list