[IGSREPORT-416] ESA07067.SUM

J. J.
Wed Aug 4 08:30:49 PDT 1993


***********************************************************************
IGS Electronic Report      4-AUG-1993 08:30:49       Message Number 416
***********************************************************************
 

From: J. Feltens
Subj: ESA07067.SUM
------------------



 -------------------------
 ANALYSIS CENTRE: ESA/ESOC
 -------------------------

 OUTLINE OF THE ESTIMATION OF GPS-ORBITS AND EARTH ROTATION PARAMETERS
 AT THE ESOC PROCESSING CENTRE FOR IGS

 J.M.Dow, J.Feltens, T.Martin-Mur, C.Garcia-Martinez

 Description of analysis for period 1993 Jul 18 - Jul 24
                                                        (week 0706)
 1. SOFTWARE USED:   GPSOBS/BAHN-Version 5

 2. MODELS USED AND PARAMETERS ESTIMATED/FIXED:

  For a description of models and parameters used ==> see IGS - Mail  51
  For updates of the models and parameters used   ==> see IGS - Mail 114 and
                                                      see IGS - Rep. 224,277

 3. REMARKS: From the beginning of 0706 on, we have included SV-39/PRN09
             into our routine IGS-processing.

 4. GROUND STATIONS: Boucher and Altamimi, IGS workshop Berne 24-27 March'93
                     IGS/IERS station coordinates in the ITRF91 at 1992.6
 ___________________________________________________________
 GPSweek|ALGO  HART  KOUR  MATE  RCM2  TROM  YAR1  |f |e |t
 0706___| FAIR  KIRU  MADR  MCMU  SANT  USUD  YELL |i |s |o
    |DAY|  GOLD  KOKB  MASP  PAMA  TIDB  WETT      |x.|t.|t.
 ---|---|------------------------------------------|--|--|--
    |199| FFF   FeF   eFe   ee-   eFF   FeF   FF   |12| 7|19
    |200| FFF   FeF   eFe   ee-   eFF   FeF   FF   |12| 7|19
    |201| FFF   F-F   eFe   ee-   eFF   FeF   F-   |11| 6|17
    |202| FFF   FeF   eFe   ee-   eFF   FeF   -F   |11| 7|18
    |203| FFF   FeF   eFe   ee-   e-F   FeF   FF   |11| 7|18
    |204| FFF   Fe-   eFe   ee-   eFF   FeF   FF   |11| 7|18
    |205| FFF   FeF   eFe   -e-   eFF   F-F   FF   |12| 5|17

    with: "F" ... coordinates of ground station kept fixed,
          "e" ... coordinates of ground station estimated,
          "-" ... ground station not included on that day.

 5. ORBIT FIT MINUS EXTRAPOLATION FROM PREVIOUS DAY, RMS IN <METER>

  \DAY|  199   200   201   202   203   204   205
   \  |
    \ |
  SAT\|
  ----|-------------------------------------------
   01 |  1.2   1.2   1.7   0.9   1.0   1.5   1.4
   02 |  1.5   1.2   1.5   1.6   1.4   3.1   2.2
   03 |  0.8   0.8   1.2   1.3   1.1   2.8   1.9
   12 |  1.2   1.0   0.8   1.1   1.1   0.9   0.6
   13 |  1.2   1.5   1.4   1.9   0.8   0.5   1.5
   14 |  0.8   1.5   1.2   1.2   1.3   0.9   1.1
   15 |  1.6   1.5   1.7   2.1   2.2   1.4   2.5
   16 |  1.0   1.1   1.7   1.9   0.6   2.6   1.0
   17 |  3.4   1.7   2.0   2.4   2.1   4.0   2.4
   18 |  1.8   1.5   1.0   0.8   0.7   1.1   0.6
   19 |  1.3   1.3   2.0   1.0   1.2   0.7   1.1
   20 |  2.2   1.9   1.8   2.5   2.1   1.8   2.2
   21 |  1.3   2.1   1.6   1.3   0.6   0.7   1.1
   22 |  1.6   1.7   1.2   1.3   1.1   0.9   1.5
   23 |  4.7   1.3   1.4   0.9   0.8   1.0   0.7
   24 |  4.0   1.7   1.8   1.8   3.8   3.8   1.7
   25 |  1.8   1.2   0.9   1.1   1.0   1.1   2.4
   26 |  2.3   0.8   1.2   2.7   2.0   1.4   3.3
   27 |  1.4   1.0   1.0   1.2   0.9   0.7   1.4
   28 |  1.6   2.1   0.8   0.4   2.1   0.4   1.8
   29 |  0.7   1.4   1.4   0.7   1.2   1.2   0.6
   31 |  1.3   2.8   1.2   1.4   1.3   2.2   1.7
   07 |  0.9   1.3   1.6   1.5   1.7   2.1   2.1
   09 |  0.0   1.4   1.3   1.7   1.1   1.3   1.5

 6. PRODUCTS GENERATED:

  The following products are generated and stored in CDDIS at NASA/GSFC:

  ESA0706*.EPH - Precise GPS orbits, *=0 for Sunday,..., 6 for Saturday
  ESA07067.ERP - Earth rotation results for week 0706 (including DUT1R)
  ESA07067.SUM - This summary file

 End of Message



More information about the IGSREPORT mailing list