[IGSREPORT-4] ESA/ESOC analysis report
Joachim
Joachim
Wed Nov 11 18:38:58 PST 1992
***********************************************************************
IGS Electronic Report 11-NOV-1992 18:38:58 Message Number 4
***********************************************************************
>From: Joachim Feltens
Subject: ESA/ESOC analysis report
------------------------
-------------------------
ANALYSIS CENTRE: ESA/ESOC
-------------------------
OUTLINE OF THE ESTIMATION OF GPS-ORBITS AND EARTH ROTATION PARAMETERS AT THE
ESOC PROCESSING CENTER FOR IGS
J.M.Dow, J.Feltens, T.Martin-Mur, C.Garcia-Martinez
Description of analysis for period 1992 October 25 - 31
1. SOFTWARE USED: GPSOBS/BAHN5
2. MODELS USED AND PARAMETERS ESTIMATED/FIXED
For a description of models and parameters we are using ===> see IGS-Mail 51
For updates of the models and parameters used =============> see IGS-Mail 114
* * *
Validity check of improved orbits for every day by comparision with predicted
orbits propagated from previous day:
On normal days this comparison gives rms of the differences normally less
than (1,3,8) metres in radial, cross track, and along track.
On A/S-days this comparison gives rms of the differences normally less
than (2,6,20) metres.
An exception this week was on day 299 (A/S-day) for PRN#26 (2,13,26) m.
3. GROUND STATIONS (if being estimated, one position (X,Y,Z) every day):
The following table gives an overview over the ground stations, that have
been included into the GPS-data processing at ESOC. Except where otherwise
noted ("remarks"), corrections are taken from IGS Mail No. 90 - IGS site
information and coordinates,updated version of IERS/IGS Tables in IGS Mail
No. 65 - (Boucher and Altamimi).
__________________________________________________________________________
| | | GPS WEEK 668 |
| | | 2 3 3 3 3 3 3 |
| | | 9 0 0 0 0 0 0 |
SITE | COUNTRY |CODE| 9 0 1 2 3 4 5 | REMARKS
--------------------|-------------|----|---------------------|------------
Algonquin | Canada |ALGO| F F F F F F F |
CANB/Tidbinbilla | Australia |TIDB| e e e e e e e |
Penticton | Canada |DRAO| F F F F F F F |
Fairbanks | U.S.A/Alaska|FAIR| F F F F F F F |
Goldstone | U.S.A. |GOLD| F F F F F F F |
Hartebeesthoek | South Africa|HART| F F F F F F F |
Kootwijk | Netherlands |KOSG| e e e e e e e |
Hobart/Tasmania | Australia |HOBA| e e e e e e e |
JPL Mesa | U.S.A./CA |JPLM| e e e e e e e | obs. file
Kokee Park | U.S.A/Hawaii|KOKB| ------------------- |
Kourou (ESA) | French Guyan|KOUR| ------------------- | own estim.
Madrid | Spain |MADR| F F F F F F F |
Maspalomas (ESA) | Spain/Can.Is|MASP| e e e e e e e |
Matera | Italy |MATE| F F F F F F F |
McMurdo | Antarctica |MCMU| e e e e e e e |
Metsahovi | Finland |METS| F F F F F F F |
Ny Alesund/Spitzb.| Norway |NYAL| e e e e e e -- |
Onsala | Sweden |ONSA| F F F F F F F |
Pamate/Tahiti | France |PAMA| e e e e e e e |
Santiago | Chile |SANT| F F F F F F -- |
St.John's, NF | Canada |STJO| e e e e e e e |
Tai-Shi | Taiwan |TAIW| ----- e e e e -- |
Usuda | Japan |USUD| e e e e e e e |
Wettzell | Germany |WETT| F F F F F F F |
Yaragadee | Australia |YAR1| F F F F F F F |
Yellowknife | Canada |YELL| F F F F F F F |
with: "F" ... coordinates of ground station kept fixed,
"e" ... coordinates of ground station estimated,
"-" ... ground station not included on that day.
- Because there are problems with Herstmonceux since a longer time, Herst-
monceux has been excluded from our set of ground stations and been re-
placed by Kootwijk in The Netherlands.
- JPL Mesa, originally used as substitute when Goldstone was missing, has
been included now, besides Goldstone, as a regular ground site into our
IGS-processing.
4. PRODUCTS GENERATED
The following products are generated and stored in CDDIS at NASA/GSFC:
ESA06687.EPH - Precise GPS orbits, * = 0 for Sunday ,..., 6 for Saturday
ESA06687.ERP - Earth rotation results for week beginning 1992 October 25
ESA06687.SUM - The name of this text file
More information about the IGSREPORT
mailing list