[IGSREPORT-30] Orbit Comparisons (message 1 out of 4)

Gerhard Gerhard
Wed Dec 2 10:38:30 PST 1992


***********************************************************************
IGS Electronic Report      2-DEC-1992 10:38:30       Message Number 30
***********************************************************************
 

From:    Gerhard Beutler 
Subject: Orbit Comparisons  (message 1 out of 4)
         ---------------------------------------

Remarks Concerning the Orbit Comparisons
________________________________________

In the following four IGS reports (including this one) you will find
orbit comparisons for GPS weeks 660 - 667 performed by our Analysis
Center Coordinator Clyde Goad.  They are quite voluminous but - I
believe - most informative.  In future there will be the possibility
to condense this information (weekly averages with associated rms
errors).  On the other hand it is most important (at least for the
processing centers) to have the full information for a number of weeks
at hand.  This issue may be discussed next week at the San Francisco
oversight committee business meeting.

When browsing through the orbit comparisons it is evident that at
CDDIS not all orbits produced by the processing centers are actually
available at CDDIS (they should be available at all three network
centers). Let me urge all processing centers contributing to the IGS
Pilot Service to make sure that their products are available in time
for future orbit comparisons !

It took some time to make these comparisons.  They reflect essentially
what was available at CDDIS October/beginning of November.  The latest
changes (e.g. the newly produced UTX orbits) could not be included.

Kind regards

Gerhard Beutler


ORBIT COMPARISON FOR DAY 1 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48864              30      8     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
 0.125 0.078 0.077   1.5  -0.9  -1.5  -0.0006  0.71  cod0660-->esa0660          
 0.057 0.020-0.037   0.6  -0.6  -1.1  -0.0008  0.49  cod0660-->emr0660          
 0.093 0.051-0.107   0.0   1.1  -3.7  -0.0004  0.50  cod0660-->utx0660          
 0.017 0.052 0.004  -2.6 -11.2  13.8  -0.0002  0.54  cod0660-->sio0660          
-0.015-0.038-0.067  -0.9  -1.1   0.6  -0.0040  0.81  cod0660-->gfz0660          
 0.051 0.042-0.079   0.8   0.0  -0.7  -0.0354  0.47  cod0660-->jpl0660          
                                                                                
-0.068-0.058-0.113  -0.9   0.3   0.4  -0.0002  0.56  esa0660-->emr0660          
-0.032-0.027-0.184  -1.6   2.0  -2.2   0.0002  0.56  esa0660-->utx0660          
-0.107-0.027-0.068  -4.1 -10.3  15.3   0.0005  0.76  esa0660-->sio0660          
-0.140-0.116-0.144  -2.4  -0.2   2.2  -0.0034  0.87  esa0660-->gfz0660          
-0.073-0.055-0.164  -0.8   0.9   0.4  -0.0347  0.55  esa0660-->jpl0660          
                                                                                
 0.036 0.030-0.071  -0.6   1.7  -2.6   0.0004  0.37  emr0660-->utx0660          
-0.040 0.032 0.043  -3.2 -10.7  14.9   0.0005  0.53  emr0660-->sio0660          
-0.072-0.058-0.030  -1.5  -0.5   1.7  -0.0032  0.78  emr0660-->gfz0660          
-0.007 0.024-0.053   0.2   0.5   0.4  -0.0343  0.31  emr0660-->jpl0660          
                                                                                
-0.073 0.002 0.113  -2.6 -12.3  17.5   0.0002  0.51  utx0660-->sio0660          
-0.108-0.088 0.041  -0.9  -2.2   4.3  -0.0036  0.76  utx0660-->gfz0660          
-0.044 0.001 0.029   1.0  -1.1   3.1  -0.0346  0.41  utx0660-->jpl0660          
                                                                                
-0.047-0.092-0.085   1.5  10.4 -13.1  -0.0046  0.81  sio0660-->gfz0660          
 0.042 0.005-0.087   3.8  11.3 -14.0  -0.0348  0.51  sio0660-->jpl0660          
                                                                                
 0.075 0.100-0.004   1.9   1.1  -1.5  -0.0306  0.75  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 2 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48865              31      8     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
 0.051 0.021 0.116   0.7  -1.5  -2.3  -0.0006  0.66  cod0660-->esa0660          
 0.069 0.030-0.032  -1.3  -1.4  -1.8  -0.0007  0.47  cod0660-->emr0660          
 0.061-0.008-0.045   0.0  -0.3  -4.6  -0.0006  0.41  cod0660-->utx0660          
 0.036 0.061 0.016  -2.8 -11.9  12.4  -0.0005  0.47  cod0660-->sio0660          
-0.046 0.029-0.011  -2.3  -1.6   0.0  -0.0044  0.85  cod0660-->gfz0660          
 0.048 0.039-0.008   0.0  -0.7  -1.6  -0.0349  0.42  cod0660-->jpl0660          
                                                                                
 0.018 0.009-0.149  -2.0   0.1   0.5  -0.0001  0.50  esa0660-->emr0660          
 0.010-0.029-0.162  -0.7   1.2  -2.3   0.0000  0.52  esa0660-->utx0660          
-0.015 0.040-0.101  -3.5 -10.4  14.6   0.0001  0.68  esa0660-->sio0660          
-0.097 0.008-0.128  -3.0  -0.1   2.3  -0.0038  0.85  esa0660-->gfz0660          
-0.004 0.018-0.125  -0.7   0.8   0.7  -0.0343  0.50  esa0660-->jpl0660          
                                                                                
-0.008-0.038-0.013   1.2   1.1  -2.8   0.0000  0.31  emr0660-->utx0660          
-0.036 0.033 0.046  -1.6 -10.6  14.1   0.0002  0.52  emr0660-->sio0660          
-0.115-0.001 0.021  -1.0  -0.2   1.8  -0.0038  0.80  emr0660-->gfz0660          
-0.022 0.010 0.023   1.3   0.7   0.2  -0.0343  0.33  emr0660-->jpl0660          
                                                                                
-0.026 0.070 0.059  -2.8 -11.6  16.9   0.0001  0.46  utx0660-->sio0660          
-0.107 0.037 0.034  -2.2  -1.2   4.6  -0.0038  0.81  utx0660-->gfz0660          
-0.014 0.048 0.036   0.0  -0.4   3.0  -0.0343  0.32  utx0660-->jpl0660          
                                                                                
-0.092-0.027-0.011   0.7  10.2 -12.3  -0.0037  0.85  sio0660-->gfz0660          
 0.012-0.023-0.025   2.9  11.2 -13.9  -0.0344  0.47  sio0660-->jpl0660          
                                                                                
 0.094 0.012 0.002   2.3   0.9  -1.7  -0.0305  0.79  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 3 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48866               1      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
 0.161 0.101 0.090   1.2  -0.7  -0.7  -0.0005  0.54  cod0660-->esa0660          
 0.102 0.053-0.024  -1.4  -1.9   0.0  -0.0005  0.44  cod0660-->emr0660          
 0.109-0.012-0.053  -0.4   0.2  -2.6  -0.0003  0.36  cod0660-->utx0660          
 0.058 0.041-0.021  -2.5 -13.4  13.8  -0.0006  0.45  cod0660-->sio0660          
-0.020 0.026-0.085  -2.1  -3.5   1.2  -0.0037  0.78  cod0660-->gfz0660          
 0.063 0.040-0.041  -0.2  -1.1   0.0  -0.0349  0.38  cod0660-->jpl0660          
                                                                                
-0.055-0.048-0.114  -2.7  -1.2   0.7  -0.0001  0.55  esa0660-->emr0660          
-0.045-0.111-0.142  -1.7   0.9  -1.9   0.0001  0.52  esa0660-->utx0660          
-0.100-0.058-0.112  -3.8 -12.7  14.4  -0.0001  0.65  esa0660-->sio0660          
-0.174-0.073-0.171  -3.4  -2.7   1.8  -0.0032  0.87  esa0660-->gfz0660          
-0.095-0.060-0.130  -1.5  -0.3   0.7  -0.0345  0.51  esa0660-->jpl0660          
                                                                                
 0.009-0.063-0.028   1.0   2.1  -2.6   0.0003  0.36  emr0660-->utx0660          
-0.045-0.007 0.001  -1.2 -11.6  13.7   0.0000  0.48  emr0660-->sio0660          
-0.119-0.025-0.058  -0.7  -1.6   1.1  -0.0031  0.78  emr0660-->gfz0660          
-0.041-0.011-0.016   1.2   0.8   0.0  -0.0344  0.35  emr0660-->jpl0660          
                                                                                
-0.050 0.054 0.030  -2.1 -13.6  16.3  -0.0003  0.46  utx0660-->sio0660          
-0.129 0.038-0.029  -1.7  -3.6   3.7  -0.0033  0.78  utx0660-->gfz0660          
-0.050 0.052 0.012   0.2  -1.3   2.6  -0.0346  0.36  utx0660-->jpl0660          
                                                                                
-0.074-0.040-0.110   0.6  10.1 -12.5  -0.0039  0.79  sio0660-->gfz0660          
 0.002-0.003-0.019   2.3  12.4 -13.8  -0.0343  0.45  sio0660-->jpl0660          
                                                                                
 0.077 0.014 0.041   1.9   2.4  -1.2  -0.0313  0.74  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 4 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48867               2      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
-0.058-0.045-0.214  -1.9   2.0   0.4  -0.0001  0.53  esa0660-->emr0660          
-0.047-0.073-0.172  -2.5   1.9  -2.6  -0.0001  0.58  esa0660-->utx0660          
-0.089-0.037-0.123  -4.2 -11.7  13.8  -0.0011  0.61  esa0660-->sio0660          
-0.105-0.048-0.191  -2.8  -0.2   1.5  -0.0035  0.82  esa0660-->gfz0660          
-0.068-0.030-0.228  -1.0   1.5   0.5  -0.0346  0.53  esa0660-->jpl0660          
                                                                                
 0.011-0.028 0.043  -0.7  -0.1  -3.0   0.0000  0.39  emr0660-->utx0660          
-0.030 0.005 0.089  -2.4 -13.7  13.5  -0.0010  0.43  emr0660-->sio0660          
-0.047-0.004 0.023  -1.0  -2.1   1.1  -0.0034  0.71  emr0660-->gfz0660          
-0.010 0.015-0.014   0.8  -0.5   0.1  -0.0345  0.30  emr0660-->jpl0660          
                                                                                
-0.036 0.032 0.047  -1.6 -13.6  16.4  -0.0011  0.37  utx0660-->sio0660          
-0.058 0.024-0.020  -0.3  -2.0   4.1  -0.0034  0.75  utx0660-->gfz0660          
-0.021 0.043-0.057   1.5  -0.4   3.1  -0.0345  0.39  utx0660-->jpl0660          
                                                                                
-0.022-0.035-0.114   1.2  11.5 -12.5  -0.0026  0.79  sio0660-->gfz0660          
 0.018 0.010-0.105   3.2  13.2 -13.3  -0.0335  0.41  sio0660-->jpl0660          
                                                                                
 0.037 0.018-0.037   1.8   1.6  -1.0  -0.0310  0.69  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 5 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48868               3      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
-0.015 0.000-0.189  -3.3  -1.0   0.3  -0.0002  0.52  esa0660-->emr0660          
-0.027-0.024-0.133  -2.7   0.5  -2.4   0.0002  0.50  esa0660-->utx0660          
-0.021 0.001-0.055  -6.3 -12.7  13.0  -0.0004  0.61  esa0660-->sio0660          
-0.077-0.023-0.200  -3.7  -1.2   2.2  -0.0036  0.84  esa0660-->gfz0660          
-0.025-0.021-0.169  -1.6   0.0   0.7  -0.0344  0.51  esa0660-->jpl0660          
                                                                                
-0.012-0.024 0.056   0.6   1.5  -2.7   0.0005  0.34  emr0660-->utx0660          
-0.003-0.002 0.134  -3.0 -11.8  12.7  -0.0002  0.52  emr0660-->sio0660          
-0.062-0.024-0.011  -0.4  -0.2   1.8  -0.0034  0.70  emr0660-->gfz0660          
-0.010-0.021 0.019   1.7   1.0   0.4  -0.0342  0.27  emr0660-->jpl0660          
                                                                                
 0.009 0.023 0.078  -3.6 -13.3  15.5  -0.0007  0.52  utx0660-->sio0660          
-0.050 0.001-0.067  -1.0  -1.7   4.6  -0.0039  0.74  utx0660-->gfz0660          
 0.002 0.003-0.037   1.1  -0.5   3.2  -0.0347  0.34  utx0660-->jpl0660          
                                                                                
-0.044-0.017-0.159   2.6  11.6 -11.0  -0.0020  0.85  sio0660-->gfz0660          
-0.008-0.021-0.116   4.7  12.8 -12.3  -0.0340  0.53  sio0660-->jpl0660          
                                                                                
 0.052 0.002 0.030   2.1   1.2  -1.4  -0.0308  0.69  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 6 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48869               4      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
 0.097-0.062-0.092  -2.3  -2.0   1.3   0.0006  0.70  esa0660-->emr0660          
 0.012-0.034-0.145  -1.6   0.5  -1.5   0.0001  0.52  esa0660-->utx0660          
 0.045-0.007-0.092  -2.6   0.3  14.0  -0.0005  0.59  esa0660-->sio0660          
-0.033-0.032-0.198  -3.0  -2.3   1.7  -0.0039  0.85  esa0660-->gfz0660          
 0.035-0.001-0.159  -1.2  -0.1   1.5  -0.0345  0.52  esa0660-->jpl0660          
                                                                                
-0.086 0.026-0.051   0.7   2.5  -2.8  -0.0004  0.50  emr0660-->utx0660          
-0.054 0.055-0.003  -0.3   2.2  12.8  -0.0010  0.55  emr0660-->sio0660          
-0.130 0.029-0.104  -0.6  -0.3   0.4  -0.0044  0.80  emr0660-->gfz0660          
-0.061 0.060-0.066   1.1   1.9   0.2  -0.0350  0.50  emr0660-->jpl0660          
                                                                                
 0.037 0.027 0.051  -1.0  -0.2  15.6  -0.0007  0.35  utx0660-->sio0660          
-0.046 0.002-0.053  -1.4  -2.8   3.2  -0.0041  0.70  utx0660-->gfz0660          
 0.022 0.033-0.014   0.4  -0.6   3.1  -0.0346  0.29  utx0660-->jpl0660          
                                                                                
-0.065-0.068-0.074  -0.6  -2.2 -12.3  -0.0028  0.73  sio0660-->gfz0660          
-0.012 0.005-0.068   1.4  -0.4 -12.5  -0.0339  0.39  sio0660-->jpl0660          
                                                                                
 0.068 0.031 0.039   1.7   2.1  -0.2  -0.0305  0.67  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 7 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48870               5      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
-0.046-0.049-0.199  -1.7   0.0  -2.9   0.0007  0.65  esa0660-->utx0660          
-0.075 0.038-0.243  -2.2  -0.7  12.6   0.0008  0.88  esa0660-->sio0660          
-0.099-0.048-0.156  -2.6  -2.2   0.4  -0.0024  1.03  esa0660-->gfz0660          
-0.060-0.024-0.186  -1.3  -0.6   0.4  -0.0338  0.71  esa0660-->jpl0660          
                                                                                
                                                                                
-0.029 0.087-0.042  -0.5  -0.7  15.6   0.0001  0.48  utx0660-->sio0660          
-0.053 0.001 0.043  -0.8  -2.2   3.3  -0.0031  0.84  utx0660-->gfz0660          
-0.014 0.025 0.013   0.5  -0.6   3.3  -0.0345  0.33  utx0660-->jpl0660          
                                                                                
-0.003-0.061 0.076  -0.3  -1.3 -12.4  -0.0035  1.02  sio0660-->gfz0660          
 0.013-0.062 0.054   1.0   0.1 -12.3  -0.0346  0.48  sio0660-->jpl0660          
                                                                                
 0.039 0.024-0.030   1.3   1.6   0.0  -0.0313  0.81  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 1 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48871               6      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
-0.012-0.042 0.026   1.1  -0.8  -1.3  -0.0009  0.60  cod0661-->esa0661          
 0.009-0.145 0.154  -0.1   1.5  -4.0  -0.0028  0.82  cod0661-->utx0661          
 0.071-0.033 0.169  -0.2   0.3  12.5  -0.0007  0.66  cod0661-->sio0661          
-0.070-0.132 0.048  -1.0  -1.9   0.7  -0.0053  0.88  cod0661-->gfz0661          
 0.058-0.153 0.001   0.7  -0.5  -1.1  -0.0353  0.56  cod0661-->jpl0661          
                                                                                
 0.021-0.102 0.129  -1.2   2.3  -2.7  -0.0019  0.75  esa0661-->utx0661          
 0.084 0.010 0.145  -1.2   1.0  13.8   0.0002  0.74  esa0661-->sio0661          
-0.058-0.089 0.023  -2.1  -1.1   2.0  -0.0044  0.92  esa0661-->gfz0661          
 0.069-0.111-0.026  -0.4   0.3   0.1  -0.0343  0.63  esa0661-->jpl0661          
                                                                                
                                                                                
 0.060 0.110 0.015  -0.1  -1.3  16.5   0.0022  0.63  utx0661-->sio0661          
-0.079 0.013-0.106  -0.9  -3.5   4.7  -0.0025  0.96  utx0661-->gfz0661          
 0.051-0.004-0.153   0.9  -2.1   2.8  -0.0325  0.71  utx0661-->jpl0661          
                                                                                
-0.171-0.044-0.095  -0.8  -2.3 -11.7  -0.0038  0.89  sio0661-->gfz0661          
-0.016-0.117-0.165   1.2  -0.7 -13.6  -0.0346  0.56  sio0661-->jpl0661          
                                                                                
 0.128-0.021-0.043   1.7   1.4  -1.8  -0.0300  0.77  gfz0661-->jpl0661          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 2 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48872               7      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
-0.010 0.064 0.166  -1.3   0.0  -0.6  -0.0011  0.75  cod0661-->esa0661          
 0.038-0.036 0.014  -1.9  -0.8  -1.0   0.0002  0.54  cod0661-->emr0661          
-0.017-0.111 0.017   1.3   2.5  -3.2  -0.0013  0.61  cod0661-->utx0661          
 0.019-0.046 0.031   0.1  -0.3  12.8  -0.0008  0.53  cod0661-->sio0661          
-0.011-0.068-0.061  -1.6  -2.0   0.4  -0.0035  0.82  cod0661-->gfz0661          
-0.006-0.098-0.085   0.9  -0.2  -0.4  -0.0354  0.43  cod0661-->jpl0661          
                                                                                
 0.048-0.097-0.149  -0.7  -0.8  -0.3   0.0012  0.79  esa0661-->emr0661          
-0.007-0.174-0.149   2.6   2.5  -2.6  -0.0002  0.81  esa0661-->utx0661          
 0.028-0.111-0.138   1.4  -0.3  13.3   0.0003  0.78  esa0661-->sio0661          
-0.001-0.132-0.227  -0.3  -2.0   1.0  -0.0024  1.05  esa0661-->gfz0661          
 0.003-0.150-0.228   2.2  -0.2  -0.3  -0.0345  0.72  esa0661-->jpl0661          
                                                                                
-0.054-0.076 0.004   3.2   3.3  -2.2  -0.0015  0.51  emr0661-->utx0661          
-0.016-0.008 0.019   2.0   0.4  13.7  -0.0010  0.41  emr0661-->sio0661          
-0.049-0.033-0.074   0.3  -1.2   1.4  -0.0037  0.73  emr0661-->gfz0661          
-0.040-0.115-0.092   2.4   0.4   1.2  -0.0352  0.32  emr0661-->jpl0661          
                                                                                
 0.043 0.066 0.010  -1.3  -2.8  15.9   0.0006  0.54  utx0661-->sio0661          
 0.005 0.042-0.078  -3.0  -4.5   3.6  -0.0022  0.86  utx0661-->gfz0661          
 0.028-0.013-0.092  -0.8  -2.8   3.4  -0.0336  0.54  utx0661-->jpl0661          
                                                                                
-0.044 0.001-0.076  -1.4  -1.8 -12.3  -0.0036  0.78  sio0661-->gfz0661          
-0.013-0.088-0.102   0.6   0.1 -12.5  -0.0343  0.41  sio0661-->jpl0661          
                                                                                
 0.017-0.085 0.000   2.1   1.6   0.2  -0.0314  0.74  gfz0661-->jpl0661          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 3 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48873               8      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
-0.008 0.170 0.071   0.2   2.0   0.8   0.0016  1.56  cod0661-->esa0661          
 0.000-0.005 0.009  -0.6   1.1  -1.2   0.0004  0.57  cod0661-->emr0661          
-0.079-0.020 0.008   3.1   2.0  -3.6  -0.0009  0.73  cod0661-->utx0661          
 0.053-0.015 0.053   0.7   0.2  12.7  -0.0013  0.61  cod0661-->sio0661          
-0.157 0.029-0.238  -1.5  -0.7  -0.6  -0.0021  1.24  cod0661-->gfz0661          
-0.012-0.060-0.088   0.5   0.2  -1.4  -0.0356  0.54  cod0661-->jpl0661          
                                                                                
 0.023-0.175-0.093  -1.2  -0.9  -2.2  -0.0014  1.54  esa0661-->emr0661          
-0.049-0.192-0.105   2.4   0.1  -4.7  -0.0028  1.48  esa0661-->utx0661          
 0.055-0.182-0.004   0.6  -1.7  11.9  -0.0027  1.59  esa0661-->sio0661          
-0.374 0.087-0.165   1.5  -0.9   0.5  -0.0023  1.93  esa0661-->gfz0661          
-0.011-0.265-0.094   0.4  -2.0  -2.3  -0.0370  1.54  esa0661-->jpl0661          
                                                                                
-0.079-0.015-0.001   3.8   0.9  -2.4  -0.0013  0.58  emr0661-->utx0661          
 0.054-0.011 0.043   1.3  -0.9  13.9  -0.0017  0.48  emr0661-->sio0661          
-0.185 0.049-0.241  -0.6  -1.6   0.8  -0.0021  1.18  emr0661-->gfz0661          
-0.003-0.094-0.072   0.8  -1.1   0.6  -0.0358  0.46  emr0661-->jpl0661          
                                                                                
 0.135 0.005 0.046  -2.5  -1.8  16.3  -0.0004  0.72  utx0661-->sio0661          
-0.125 0.094-0.237  -4.1  -2.4   3.4  -0.0007  1.31  utx0661-->gfz0661          
 0.089-0.072-0.082  -3.0  -2.0   2.9  -0.0344  0.69  utx0661-->jpl0661          
                                                                                
-0.223 0.038-0.309  -2.2  -1.1 -13.4  -0.0004  1.11  sio0661-->gfz0661          
-0.056-0.075-0.118  -0.3  -0.1 -12.9  -0.0341  0.48  sio0661-->jpl0661          
                                                                                
 0.157-0.153 0.209   1.8   0.7   0.6  -0.0330  1.16  gfz0661-->jpl0661          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 4 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48874               9      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
 0.031 0.024-0.021   0.6  -1.3  -2.1  -0.0007  0.81  cod0661-->esa0661          
 0.045 0.016-0.074  -2.2   1.0  -1.5  -0.0003  0.61  cod0661-->emr0661          
-0.005-0.038-0.032   1.1   1.6  -4.8  -0.0008  0.68  cod0661-->utx0661          
 0.022-0.021 0.066   0.5   0.0  12.6  -0.0007  0.61  cod0661-->sio0661          
-0.036-0.014-0.075  -1.4  -1.4  -0.3  -0.0059  0.91  cod0661-->gfz0661          
-0.003-0.120-0.108   0.3  -0.2   0.2  -0.0349  0.55  cod0661-->jpl0661          
                                                                                
 0.016-0.008-0.056  -2.8   2.3   0.5   0.0003  0.73  esa0661-->emr0661          
-0.036-0.063-0.014   0.5   2.9  -2.7  -0.0002  0.83  esa0661-->utx0661          
-0.009-0.048 0.087  -0.1   1.3  14.6   0.0000  0.81  esa0661-->sio0661          
-0.093-0.035-0.057  -1.8  -0.1   1.5  -0.0051  0.99  esa0661-->gfz0661          
-0.040-0.155-0.098  -0.3   1.1   1.3  -0.0346  0.75  esa0661-->jpl0661          
                                                                                
-0.052-0.055 0.042   3.3   0.6  -3.3  -0.0005  0.52  emr0661-->utx0661          
-0.025-0.037 0.141   2.7  -1.0  14.1  -0.0004  0.42  emr0661-->sio0661          
-0.081-0.025-0.008   0.7  -2.4   1.0  -0.0056  0.74  emr0661-->gfz0661          
-0.053-0.147-0.049   2.6  -1.2   0.9  -0.0347  0.34  emr0661-->jpl0661          
                                                                                
 0.029 0.015 0.098  -0.6  -1.6  17.4   0.0001  0.59  utx0661-->sio0661          
-0.036 0.025-0.040  -2.5  -3.0   4.4  -0.0050  0.83  utx0661-->gfz0661          
 0.029-0.099-0.079  -0.5  -1.7   4.2  -0.0347  0.52  utx0661-->jpl0661          
                                                                                
-0.056 0.020-0.131  -1.9  -1.8 -12.9  -0.0048  0.77  sio0661-->gfz0661          
-0.013-0.111-0.185   0.0  -0.1 -13.0  -0.0347  0.42  sio0661-->jpl0661          
                                                                                
 0.049-0.132-0.027   2.1   1.2   0.0  -0.0301  0.75  gfz0661-->jpl0661          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 5 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48875              10      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
-0.071-0.088-0.047  -2.4   1.9  -0.1  -0.0008  0.71  esa0661-->emr0661          
 0.009-0.113-0.020   1.1   4.0  -3.7  -0.0024  0.78  esa0661-->utx0661          
-0.011-0.111 0.032   0.9   2.8  14.6  -0.0014  0.84  esa0661-->sio0661          
-0.180-0.042-0.068  -0.5   2.3   2.2  -0.0049  1.02  esa0661-->gfz0661          
-0.053-0.209-0.124   0.1   2.2   0.7  -0.0356  0.70  esa0661-->jpl0661          
                                                                                
 0.079-0.025 0.026   3.5   2.1  -3.6  -0.0016  0.52  emr0661-->utx0661          
 0.063-0.024 0.077   3.2   0.8  14.7  -0.0007  0.47  emr0661-->sio0661          
-0.109 0.045-0.021   1.8   0.3   2.3  -0.0041  0.84  emr0661-->gfz0661          
 0.032-0.114-0.077   2.6   0.3   0.6  -0.0348  0.36  emr0661-->jpl0661          
                                                                                
-0.012-0.001 0.049  -0.3  -1.3  18.2   0.0008  0.57  utx0661-->sio0661          
-0.189 0.070-0.048  -1.7  -1.8   5.8  -0.0025  0.94  utx0661-->gfz0661          
-0.011-0.089-0.092  -0.6  -1.9   4.3  -0.0337  0.55  utx0661-->jpl0661          
                                                                                
-0.152 0.098-0.094  -1.3  -0.7 -12.5  -0.0042  0.83  sio0661-->gfz0661          
-0.020-0.090-0.145  -0.5  -0.5 -13.7  -0.0346  0.42  sio0661-->jpl0661          
                                                                                
 0.161-0.172-0.062   0.9   0.0  -1.6  -0.0309  0.83  gfz0661-->jpl0661          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 6 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48876              11      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
-0.006 0.004 0.042  -1.3   0.5  -0.5   0.0006  0.83  esa0661-->emr0661          
-0.054-0.004-0.001   1.8   4.3  -1.7  -0.0003  0.85  esa0661-->utx0661          
-0.020-0.027 0.059   2.1   0.2  14.9  -0.0008  0.90  esa0661-->sio0661          
-0.088-0.013-0.051  -0.6  -1.0   1.2  -0.0042  1.12  esa0661-->gfz0661          
-0.071-0.073-0.027   0.8   0.6   1.6  -0.0354  0.82  esa0661-->jpl0661          
                                                                                
-0.048-0.008-0.043   3.1   3.8  -1.2  -0.0009  0.46  emr0661-->utx0661          
-0.015-0.033 0.017   3.4  -0.3  15.5  -0.0013  0.46  emr0661-->sio0661          
-0.082-0.017-0.093   0.7  -1.5   1.7  -0.0048  0.76  emr0661-->gfz0661          
-0.028-0.073-0.061   2.4   0.1   1.4  -0.0361  0.35  emr0661-->jpl0661          
                                                                                
 0.035-0.027 0.060   0.3  -4.1  16.7  -0.0004  0.50  utx0661-->sio0661          
-0.034-0.009-0.050  -2.4  -5.3   2.9  -0.0039  0.84  utx0661-->gfz0661          
 0.039-0.066-0.013  -0.6  -3.8   2.3  -0.0355  0.49  utx0661-->jpl0661          
                                                                                
-0.063 0.005-0.096  -2.5  -1.2 -13.9  -0.0040  0.82  sio0661-->gfz0661          
-0.005-0.041-0.079  -0.9   0.4 -14.0  -0.0351  0.45  sio0661-->jpl0661          
                                                                                
 0.065-0.056 0.031   1.7   1.6  -0.5  -0.0315  0.77  gfz0661-->jpl0661          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 7 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48877              12      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
------------------------------------------------------------------------        
                                                                                



More information about the IGSREPORT mailing list