[IGSREPORT-27] ESA/ESOC analysis report
Tomas
Tomas
Tue Dec 1 16:30:51 PST 1992
***********************************************************************
IGS Electronic Report 1-DEC-1992 16:30:51 Message Number 27
***********************************************************************
From: Tomas Martin Mur
Subject: ESA/ESOC analysis report
------------------------
-------------------------
ANALYSIS CENTRE: ESA/ESOC
-------------------------
OUTLINE OF THE ESTIMATION OF GPS-ORBITS AND EARTH ROTATION PARAMETERS
AT THE ESOC PROCESSING CENTER FOR IGS
J.M.Dow, J.Feltens, T.Martin Mur, C.Garcia-Martinez
Description of analysis for period 1992 November 15 - 21
1. SOFTWARE USED: GPSOBS/BAHN5
2. MODELS USED AND PARAMETERS ESTIMATED/FIXED
For a description of models and parameters used ==> see IGS - Mail 51
For updates of the models and parameters used ==> see IGS - Mail 114
* * *
We have obtained four days of data (323 to 326) from the receiver in
Kourou this week. The antenna has been moved to a new position since
the last time Kourou was operational.
With the data of this week we have estimated the following coordinates
for the phase center of the antenna in its new location:
System of coordinates: ITRF91 at 1992.5
X: 3 839 591.516 m SX: 0.022 m
Y: -5 059 567.968 m SY: 0.022 m
Z: 579 956.867 m SZ: 0.009 m
* * *
From this week we have started to estimate the rate of change of the
difference between UT1R (UT1 regularised) and TAI. We call this
parameter DUT1R. The typical standard deviation that we obtain when we
estimate it is .05 msec/day.
We have also changed the time span from 30 hours to 24 hours, so the
estimate of DUT1R can be used to determine the change in UT1R for the
day.
* * *
We have obtained unusually high rms of differences between the fitted
and propagated orbits for the satellite 17 on days 323 and 326, and
high differences for this satellite for the other days.
3. GROUND STATIONS (if being estimated, one position (X,Y,Z) every day):
The following table gives an overview over the ground stations that
have been included into the GPS-data processing at ESOC. Except where
otherwise noted ("remarks"), corrections are taken from IGS Mail
No. 90 - IGS site information and coordinates,updated version of
IERS/IGS Tables in IGS Mail No. 65 - (Boucher and Altamimi).
______________________________________________________________________
| | | GPS WEEK 671 |
| | | 3 3 3 3 3 3 3 |
| | | 2 2 2 2 2 2 2 |
SITE | COUNTRY |CODE| 0 1 2 3 4 5 6 | REMARKS
-------------------|-------------|----|---------------------|---------
Albert Head | Canada |ALBH| e e e e e e e |
Algonquin | Canada |ALGO| F F F F F F F |
CANB/Tidbinbilla | Australia |TIDB| e e e e e e e |
Penticton | Canada |DRAO| F F F F F F F |
Fairbanks | U.S.A./AK |FAIR| F F F F F F F |
Goldstone | U.S.A./CA |GOLD| F F F F F F F |
Graz | Austria |GRAZ| F F F F F F F |
Hartebeesthoek | South Africa|HART| F F F F F F F |
Hobart/Tasmania | Australia |HOBA| e e e e e e e |
JPL Mesa | U.S.A./CA |JPLM| e e e e e e e |own est.
Kootwijk | Netherlands |KOSG| e e e e e e e |
Kokee Park | U.S.A/Hawaii|KOKB| e e e e e e e |
Kourou (ESA) | French Guyan|KOUR| - - - e e e e |own est.
Madrid | Spain |MADR| F F F F F F F |
Maspalomas (ESA) | Spain/Can.Is|MASP| e e e e e e e |
Matera | Italy |MATE| F F F F F F F |
McMurdo | Antarctica |MCMU| e e e e e e e |
Metsahovi | Finland |METS| F F F F F F F |
Ny Alesund/Spitzb.| Norway |NYAL| - - - - - - - |
Onsala | Sweden |ONSA| F F F F F F F |
Pamate/Tahiti | France |PAMA| e e e e e e e |
Richmond | U.S.A./FL |RCM2| e e e e e e e |
Santiago | Chile |SANT| F F F F F F F |
St.John's, NF | Canada |STJO| e e e e e e e |
Tai-Shi | Taiwan |TAIW| - - - - - - - |
Tromso | Norway |TROM| e e e e e e e |
Usuda | Japan |USUD| e e e e e e e |
Wettzell | Germany |WETT| F F F F F F F |
Yaragadee | Australia |YAR1| F F F F F F F |
Yellowknife | Canada |YELL| F F F F F F F |
with: "F" ... coordinates of ground station kept fixed,
"e" ... coordinates of ground station estimated,
"-" ... station not included on that day.
4. PRODUCTS GENERATED
The following products are generated and stored in CDDIS at NASA/GSFC:
ESA0671*.EPH - Precise GPS orbits, *=0 for Sunday,..., 6 for Saturday
ESA06717.ERP - Earth rotation results for week 0671 (including DUT1R)
ESA06717.SUM - This summary file
End of Message
More information about the IGSREPORT
mailing list