[IGSMAIL-8653] Updated antenna model for BDS-3/QZSS and BDS-3 signal switch to B1C/B2a
Steigenberger, Peter
steigenberger at tum.de
Thu Jan 22 06:56:32 UTC 2026
Dear colleagues,
the operational IGS products currently cover GPS, GLONASS and Galileo.
BeiDou and QZSS are only included in the products of the Multi-GNSS
Pilot Project (MGEX). The inclusion of these constellations in the
operational products is currently hampered by scale inconsistencies of
the BDS and QZSS antenna models with the IGS20 reference frame scale.
In order to overcome these inconsistencies, the IGS Reference Frame
Committee, Antenna Committee, and the Multi-GNSS Pilot Project together
with ten IGS/MGEX ACs have generated a new BDS-3/QZSS antenna model
aligned to the IGS20 scale. This model comprises:
BeiDou-3:
+ Block-specific estimated B1C/B2a phase patterns from COD, ESA, GFZ,
SHA, TUM, WHU with extrapolation to 15 deg for BDS-3 MEO satellites
+ Block-specific estimated B1C/B2a phase patterns from COD, SHA, TUM,
WHU with extrapolation to 10 deg for BDS-3 IGSO satellites
+ Retained x/y-PCOs and B1 z-PCOs from CSNO/TARC
+ Adjusted B2 and B3 z-PCOs of BDS-3 MEO and IGSO satellites to obtain
SVN-specific B1C/B2a and B1I/B3I z-PCOs aligned to IGS20 as estimated by
CAS, COD, GFZ, GRG, JGX, SHA, TUM, WHU (B1C/B2a) as well as DLR and WHU
(B1I/B3I)
+ Multiple intervals are considered for selected SECM satellites with
time-varying PCOs. In this case, no PCOs are provided prior to 01-Jan-2021
+ Preliminary z-PCOs of C232 and C233 are based on copied CSNO vales of
C228 and IGS estimates
+ Preliminary z-PCOs of C234 and C235 are based on copied CSNO vales of
C225 and DLR estimates only
QZSS:
+ limited to L1 and L5 as new QZSS Block III satellites do not transmit
L2 anymore
+ satellite-specific phase patterns provided by Cabinet Office (except
for J001)
+ satellite-specific x/y-PCOs provided by Cabinet Office
+ J003, J005, J007: z-PCOs provided by Cabinet Office
+ J001, J002, J004: Estimated L1/L5 z-PCOs by COD, GFZ, JGX, TUM
Further details can be found in the following presentations:
Phase pattern estimation, IGS Workshop 2024:
https://elib.dlr.de/205651/1/IGSWS_2024_BDS_QZS_camp.pdf
PCO estimation, IAG Scientific Assembly 2025:
https://elib.dlr.de/216593/1/IAG_2025_BDSant.pdf
This BDS-3 and QZSS antenna model update will be included in the IGS
antenna model igs20.atx at the first day of GPS week 2405, i.e., 8
February 2026. This ANTEX file is currently available at
http://ftp.aiub.unibe.ch/awg/pcv_proposed/igs20_2405.atx.gz
At the same time, the MGEX ACs processing BeiDou will switch their
signal selection from the legacy B1I/B3I signals to the modernized
B1C/B2a signals. As the latter are only transmitted by BDS-3, this also
means that BDS-2 satellites are not included anymore in the MGEX products.
Best regards,
Arturo Villiger, IGS Antenna Committee
Paul Rebischung, IGS Reference Frame Committee
Peter Steigenberger, IGS Multi-GNSS Pilot Project
More information about the IGSMail
mailing list