[IGSMAIL-3425]: BRUS - clock jump and receiver disruption
Pascale Defraigne
pascale.defraigne at oma.be
Tue Jul 17 07:25:22 PDT 2001
******************************************************************************
IGS Electronic Mail 17 Jul 07:25:31 PDT 2001 Message Number 3425
******************************************************************************
Author: P. Defraigne, ROB
Dear colleagues,
The H-maser connected to the Z12-T receiver at BRUS presented
some problems during the week 2001.07.11 to 2001.07.17
A first jump was monitored as : 5.959 microsecond on doy 192, 12UT.
A second jump occured on doy 197, 12UT leading to bad observations and
finally a tracking interruption. The H-maser was then re-synchronized,
and restarted on doy 198, 13UT.
In addition we expect that there will be no data from BRUS between
24 and 31 july, because the receiver is participating to the
calibration campaign organized by the BIPM in order to determine
its hardware delays.
We apologize for these inconveniences,
P. Defraigne
--
__________________________________________
Pascale DEFRAIGNE
Royal Observatory of BELGIUM
Avenue Circulaire, 3
B-1180 BRUSSELS
BELGIUM
Tel.: 32 / 2 / 373 02 60
Fax : 32 / 2 / 374 98 22
e-mail: P.Defraigne at oma.be
__________________________________________
More information about the IGSMail
mailing list