[IGSMAIL-3260]: NTUS temporarily out of operation
Danny van Loon
D.L.F.vanLoon at geo.tudelft.nl
Sat Mar 31 01:18:19 PST 2001
******************************************************************************
IGS Electronic Mail 31 Mar 01:18:23 PST 2001 Message Number 3260
******************************************************************************
Author: Danny van Loon
Since March 10, 2001 DOY=69 the IGS station NTUS is out of operation
again. We discovered after a long period of testing that the
steering feature of the internal clock of the TurboRogue receiver S/N 224
is failing again after several repairs at Allen Osborne Associates. This
also occurred at this station with receiver S/N 229 at the time it was
installed there. This receiver has now been moved to station KOSG where it
is operating quite well connected to an external frequency standard and
the internal one disabled.
We are now seeking either for a similar solution for NTUS or replace it
temporarily by another one during its repair or replace it by a complete
different instrument. We are in discussion with AOA and await their
suggestions. We hope to bring NTUS as soon as possible into operation again.
We really appologize for this inconvenience.
****************************************************************************
Danny van Loon
Delft Institute for Earth Oriented Space Research (DEOS)
Delft University of Technology (DUT)
Thijsseweg 11
2629 JA Delft
The Netherlands
Tel. +31 15 2788137/ +31 570 672720
Fax. +31 570 671628
Mobile phone: +31 6 54944637
E-mail: vanloon at geo.tudelft.nl
More information about the IGSMail
mailing list