Recommendations from Oslo Network Workshop 2000
Friday, July 14, 2000
Summary session attendees:
C. Bruyninx
M. Caissy
M. Chin
B. Engen
W. Gurtner
P. Heroux
T. Herring
A. Moore
R. Neilan
C. Noll
H-P Plag
T. Springer
D. Stowers
B. Twilley
H. Van der Marel
M. Van Domselaar
J. Zumberge
New Committee
----------------------
1. It is recommended that a committee be formed to establish a data
format suitable for efficient exchange of real-time data. This
committee is to be co-chaired by Werner Gurtner and Angelyn Moore.
Plan: Committee members are:
Mark Caissy,
Miranda Chin
Kees DeJong,
Lou Estey,
Roman Galas,
Werner Gurtner.
Rune Hanssen, and
Tor Melgaard,
Angelyn Moore,
Ron Muellerschoen,
George Preiss,
The CB will invite representatives from equipment manufacturers to
participate where appropriate. An initial task is to evaluate
whether the RTCM format meets IGS requirements (or could with
modifications).
Data Center Issues
-------------------------
2a. Ensure that data center information available through IGS Central
Bureau (ftp://igscb.jpl.nasa.gov/igscb/center/data/) is complete and
current for all IGS participants. Add backup data flow paths to this
data center information.
2b. Complete a backup data flow plan for daily and hourly IGS data
and IGS products. Ensure all data center (and analysis center)
contacts have reviewed the plan and will implement its procedures.
Schedule tests of the backup data flow paths on a regular basis to
ensure their operational readiness.
2c. Data centers should create and monitor ftp put areas (anonymous
or username/password) to facilitate flow of data and products in a
backup situation.
3a. Global Data Centers (GDCs) should develop mutually agreeable
guidelines for failovers during downtime of any GDC.
3b. GDCs should examine the feasibility of providing equivalent paths
to IGS data for user ease.
3c. GDCs should evaluate whether a trial of LDM for data equalization
among GDCs is appropriate.
Plan: UNAVCO, CDDIS and SOPAC intend to conduct a preliminary test.
4a. Operational Data Centers (ODCs) should be reminded to provide
SNRs in RINEX data, and to provide all hourly data, even if late (but
within 3 days).
4b. All components should be reminded of data republishing guidelines.
4c. RINEX data in a file must conform to a period in which the header
metadata in the file is valid.
Physical Site Specs
--------------------
5. Operators of suspected unstable sites should make precise 3-d
measurements to local reference sites and make the data available to
the IGS. Guidelines on the form of this information should be
provided.
6. A review of the current official IGS phase center variation table
and a procedure for incorporating new antennas or measurements is
required.
Plan: Gerry Mader should be invited to lead this effort and Markus
Rothacher should affirm whether he is able to participate. Bruce
Schupler's participation will also be invited.
Note: Operators can cope with equipment changes during a day or hour
by using mid-file headers, or partial daily files.
CB & ACC/ACs/AACs Actions
----------------------------
7. Continue improvement of quality information and feedback available
to site operators and end users. Mechanisms for propagating notices
of known future incidents (e.g. equipment changes) directly into
analysis software should be investigated, as well as mechanisms for
automatically identifying troublesome data from the past.
Plan: ITRF processing and point-positioning residuals should be
examined as possible sources of quality assessment metrics which
could provide useful feedback and/or early warning of problematic
data. The SINEX template is a possible vehicle for noting
questionable data periods since it is already an official conduit for
metadata.
CB Actions
--------------------
8. The CB should provide an interface to specifications and
information regarding suitable geodetic monuments.
Plan: An initial phase is to provide links to or as-is copies of
existing guides put together by agencies such as NRCan and NGS.
Monument information from the position paper by L. Combrinck and M.
Chin should be incorporated into the physical site specification
document under preparation.
9. Any barriers to full commitment of Global Data Centers to IGS
projects should be ascertained.
10. Alternate availability points for IGS site logs is discouraged
unless the CB can verify sufficient guarantee of timeliness and
integrity.
11. Establish and maintain email distribution lists for key data
center contacts at the IGS Central Bureau. The use of distribution
lists could be extended for all components of the IGS.
General Actions
--------------------
12. The IGS should continue to encourage initiation of more hourly
stations outside North America and Europe, and more stations with
precise meteorological instrumentation.
More information about the IGSMail