IGS Final orbits/clocks completed and put onto CDDIS (Weeks 755 -759)
                                                     (June 26 - July 30, 1994)
*******************************************************************************

According to the recommendations of the Analysis Centre Workshop the IGS
Rapid Orbits were recomputed using up to date orbits and the final EOP values
of Bulletin B, published by IERS. ( Daily values, page 2 of Bull. B )
The EOP were corrected for the difference between the IERS pole series 
and ITRF as published in the IERS 1992 Annual Report (p. II-17, Table II-3),
so both the IGS orbits and the associated ERP files are consistent with ITRF92
(current epoch).

We have downloaded all the submitted ephemeris and ERP files from CDDIS before
the final orbit/clock combination to ensure that the sets are complete and up
to date. In the final combination we have largely followed the actions taken
during the Rapid orbit generation and since there were very few orbit
resubmissions, both the IGS Rapid  and Final orbits are virtually same except
for the the orientation difference (the current Bull.A and final Bull.B).
Orbit evaluation are also nearly the same, since we used centre specific ERP
in the long arc evaluations. For more information see the corresponding
summary files on CDDIS.

Starting with the GPS week 742 a new clock combination scheme was put in place
for the final orbit/clock combinations. The clock solution alignment and centre
clock weight assignment are based on non SA broadcast  satellite corrections
only (PRN12, 15, 20). This should result in more realistic and objective clock
weighting than employed before, provided that the non SA satellites are
representatives of centre clock solution quality. Starting with the GPS
week 756 the new IGS erp format (see IGSMAIL# 662) is used by all Analysis
Centres and for the IGS erp files. ERP rates, whenever given, are also utilized
in both orbit combination and the long arc evaluation.

PRODUCTS GENERATED:

The resulting final IGS ephemeris and clocks are in daily files in the SP3
format. The sat. orb. accuracy codes displayed in the headers are based on
weighted RMS for each satellite. Note that each file contains all the submitted
satellites. If satellite or centre had to be excluded from the combination it
is noted in the summary file along with the reason for doing so.

The IGS FINAL ORBIT files generated and uploaded into CDDIS @ NASA/GSFC are:

IGS07550-6.SP3   IGS GPS orbit/clock files for days 0-6, week 0755
IGS07560-6.SP3   IGS GPS orbit/clock files for days 0-6, week 0756
IGS07570-6.SP3   IGS GPS orbit/clock files for days 0-6, week 0757
IGS07580-6.SP3   IGS GPS orbit/clock files for days 0-6, week 0758
IGS07590-6.SP3   IGS GPS orbit/clock files for days 0-6, week 0759

IGS07557.ERP    EOP associated with the above orbits (Bull. B aligned to ITRF)
IGS07567.ERP    EOP associated with the above orbits (Bull. B aligned to ITRF)
IGS07577.ERP    EOP associated with the above orbits (Bull. B aligned to ITRF)
IGS07587.ERP    EOP associated with the above orbits (Bull. B aligned to ITRF)
IGS07597.ERP    EOP associated with the above orbits (Bull. B aligned to ITRF)

IGS07557.SUM    Complete summary/statistics report
IGS07567.SUM    Complete summary/statistics report
IGS07577.SUM    Complete summary/statistics report
IGS07587.SUM    Complete summary/statistics report
IGS07597.SUM    Complete summary/statistics report

The old Rapid Orbit files have been renamed (on CDDIS) to:
(Note this is temporary, based on discussions with AC and GB and may be
changed )

IGR07550-6.SP3   Rapid service orbits/clocks for days 0-6, week 755
IGR07560-6.SP3   Rapid service orbits/clocks for days 0-6, week 756
IGR07570-6.SP3   Rapid service orbits/clocks for days 0-6, week 757
IGR07580-6.SP3   Rapid service orbits/clocks for days 0-6, week 758
IGR07590-6.SP3   Rapid service orbits/clocks for days 0-6, week 759

IGR07557.ERP     Rapid service EOP associated with the above orbits (Bull A)
IGR07567.ERP     Rapid service EOP associated with the above orbits (Bull A)
IGR07577.ERP     Rapid service EOP associated with the above orbits (Bull A)
IGR07587.ERP     Rapid service EOP associated with the above orbits (Bull A)
IGR07597.ERP     Rapid service EOP associated with the above orbits (Bull A)

IGR07557.SUM     Rapid service complete summary/statistic report 
IGR07567.SUM     Rapid service complete summary/statistic report 
IGR07577.SUM     Rapid service complete summary/statistic report 
IGR07587.SUM     Rapid service complete summary/statistic report 
IGR07597.SUM     Rapid service complete summary/statistic report 

 *****************************************************************************

REMARKS/CORRECTIONS:

None


[Mailed From: Jan Kouba <kouba at geod.emr.ca>]