<font size=2 face="sans-serif">Author: Mark van Kints</font>
<br>
<br><font size=2 face="sans-serif">Dear all, </font>
<br>
<br><font size=2 face="sans-serif">Our station NNOR is out for a week due
to general maintenance starting the 5th of October @01:47 UTC and ending
the 11th of October @01:47 UTC</font>
<br><font size=2 face="sans-serif">File availability should be nominal
again once the power is back on the 11th. </font>
<br>
<br><font size=2 face="sans-serif">Sorry for the late notification. </font>
<br>
<br><font size=2 face="sans-serif">Best regards</font>
<br><font size=2 face="sans-serif">___________<br>
<br>
Mark van Kints<br>
Navigation Operations Engineer - GMV<br>
European Space Operations Centre (ESA/ESOC)<br>
Navigation Facility, HSO-GN<br>
Robert Bosch Strasse 5<br>
64293 Darmstadt<br>
Germany<br>
Tel: +49 6151 90 4069<br>
Fax: +49 6151 90 3431</font>
<br><PRE>This message and any attachments are intended for the use of the addressee or addressees only. The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its content is not permitted. If you received this message in error, please notify the sender and delete it from your system. Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.
</PRE>