<br clear="all"><font face="courier new,monospace">Dear Colleagues,<br><br>IGS Final 
Orbit product for Wk 1714 was replaced due to abnormal file handling for
 JPL's 1714-4 submission.  JPL's file submission was correct but it had a
 glitch while copying it to the weekly combination directory.  The 
truncated sp3 caused rejection in the combination and finally caused 
failure of JPL's Long-arc report for the entire week.<br>
<br>The problem was detected shortly after the IGS Final product 
submission earlier today and had been corrected by rerunning the entire 
week's combination.  In conclusion, there were minor changes in WRMS for
 each AC therefore IGS PPP was affected as well. <br>
<br>I apologize for the inconvenience this may have caused.<br><br><br>Regards, <br><br>Kevin<br><br><br></font>Kevin K. Choi, Ph.D.                                                    <br>Geodesist<br>Deputy IGS Analysis Center Coordinator<br>

National Geodetic Survey<br>NOAA/NOS, SSMC3-8104 <br>1315 East-West Hwy.Silver Spring, MD 20910<br>Email: <a href="mailto:kevin.choi@noaa.gov" target="_blank">kevin.choi@noaa.gov</a><br>Office: 301-713-3198 x121<br><br><br>

<br>